What the public permit record shows, not self-reported reviews.
Is UIG CONSTRUCTION LLC a real contractor?
UIG CONSTRUCTION LLC appears in public building-permit records with 14 permits filed through 2023 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is UIG CONSTRUCTION LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to UIG CONSTRUCTION LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is UIG CONSTRUCTION LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. UIG CONSTRUCTION LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is UIG CONSTRUCTION LLC's work?
The most recent permit on record for UIG CONSTRUCTION LLC is dated 2023-11-28, with 14 permits on file in total.
FOR LEVEL II INTERIOR ALTERATIONS AT THE 2ND FLOOR TO INCLUDE NEW FIRE-RESISTANCE-RATED PARTITIONS AND FIRE DOORS TO CREATE TWO (2) GROUP R-1 VISITOR ACCOMMODATIONS UNITS (202A & 202B) FROM ONE (1) EXISTING UNIT (202) FOR A NEW TOTAL OF SIXTEEN (16) UNITS AT THAT FLOOR. EXISTING BUILDING IS FULLY SPRINKLERED PER NFPA 13 AND EQUIPPED WITH STANDPIPES IN EXIT STAIRWAY ENCLOSURES IN ACCORDANCE WITH NFPA 14. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.City of Philadelphia · 2023
MAKE SAFE PERMIT - For the removal and replacement of exterior wall sheathings to resolve case CF-2023-083885. Abutting sidewalk must be closed with fencing a minimum of 6’ in height. Separate Streets Department permit required for sidewalk closure. A Separate permit is required for any additional alterations that are not specifically addressed on case #CF-2023-083885. In accordance with Code Bulletin PM-1801, a PA professional engineer is required to monitor repairs made under this permit. The engineer must submit a sealed statement to the Department confirming that the structure is in sound condition at completion.”City of Philadelphia · 2023
LEVEL II ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE A PREPARED FOOD SHOP IN THE FIRST FLOOR AND BASEMENT OF AN EXISTING BUILDING AS PER APPROVED PLANS. BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**City of Philadelphia · 2022
FOR THE INTERIOR ALTERATIONS OF AN EXISTING THREE (3) STORY BUILDING TO INCLUDE FOURTEEN (14) DWELLING UNITS. BUILDING TO BE SPRINKLERED PER NFPA 13R THROUGHOUT. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLAN. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
**SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.**
**IEBC 2018**City of Philadelphia · 2021
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you UIG CONSTRUCTION LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to UIG CONSTRUCTION LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
90 DAY TCO .... FLOORS 6 THROUGH 9City of Philadelphia · 2019
90 DAY TCO .... FLOORS 1 THROUGH 5 TO INCLUDE BASEMENT.RESTUARANT ON FIRST FLOOR IS NOT INCLUDED ON THIS TCO. THERE IS A SEPERATE PERMIT FOR THIS AREA.City of Philadelphia · 2019
PARTIAL CHANGE OF OCCUPANCY CLASSIFICATION & LEVEL 2 ALTERATIONS TO CREATE RESTAURANT TENANT SPACE W/IN EXIST. MIXED-USE MULTI-FAMILY DWELLING HIGH-RISE BUILDING INCLUDING DEMOLITION OF PARTITION WALLS, ERECTION OF PARTITION WALLS FOR KITCHEN, DINING, & BATHROOM SPACES, & ALL OTHER FINISH WORK PER APPROVED PLANS; BUILDING IS FULLY SPRINKLERED. SEPARATE PERMIT REQ'D FOR ANY SIGNAGE INSTALLATION & ANY MECH., ELEC., PLUMB., & FIRESUPP WORK.City of Philadelphia · 2018
FOR THE AMENDMENT OF PREVIOUSLY APPROVED PERMIT #746755 TO REVISE THE DESIGN PROFESSIONAL IN CHARGE OF SPECIAL INSPECTIONS TO RAY CROSSAN OF FIDELIS ENGINEERING AND TO REVISE THE SPECIAL INSPECTOR /ENGINEER PERFORMING INSPECTIONS TO FIDELIS ENGINEERING. ORIGINAL PERMIT ISSUED FOR THE ERECTION OF A FIVE STORY STRUCTURE WITH ROOF DECKS ACCESSED BY ROOF DECK ACCESS STRUCTURES FOR RESIDENTIAL USE ONLY. STRUCURE FOR USE AS A VACANT COMMERICAL SPACE (SEPARATE USE PERMIT AND INTERIOR FITOUT REQUIRED PRIOR TO OCCUPANCY) ON THE FIRST FLOOR LEVEL WITH A MULTI-FAMILY DWELLING ABOVE (SEVEN (7) DWELLING UNITS). BUILDING IS FULLY SPRINKLERED. SCISSOR STAIRWAY ENCLOSURE TO CONTAIN TWO STANDPIPES WITH EACH RESPECTIVE ENCLOSURE TO ENSURE THERE IS NO PENETRATION OF SCISSOR STAIRWAY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 16 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2009 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2018
AMENDMENT:FOR THE AMENDMENT OF PREVIOUSLY APPROVED PERMIT #746755 TO DOCUMENT FIELD CHANGES THAT DO NOT COMPLY WITH PREVIOUSLY APPROVED CONSTRUCTION TYPE. THE CONSTRUCTION METHOD WAS APPROVED VIA BBS VARIANCE CASE NO. MI-2021-004919 WITH THE FOLLOWING PROVISOS: ALL EXTERIOR SHEATHING TO BE REMOVED AND APPLY FLAMEOFF FIRE BARRIER PAINT, PER THE MANUFACTURER'S INSTRUCTIONS, A 30MIL THICKNESS, TO ACHIEVE A ONE HOUR RATING ON ALL EXTERIOR WOOD STUDS, ALL FACES INCLUDING DOUBLE TOP PLATES AND SILL PLATES. BUILDING MUST BE RE-SHEATHED WITH A CODE COMPLIANT FIRE TREATED SHEATHING. A SPRINKLER HEAD MUST BE PROVIDED ON ALL EXTERIOR WINDOWS.
ORIGINAL: FOR THE ERECTION OF A FIVE STORY STRUCTURE WITH ROOF DECKS ACCESSED BY ROOF DECK ACCESS STRUCTURES FOR RESIDENTIAL USE ONLY. STRUCURE FOR USE AS A VACANT COMMERICAL SPACE (SEPARATE USE PERMIT AND INTERIOR FITOUT REQUIRED PRIOR TO OCCUPANCY) ON THE FIRST FLOOR LEVEL WITH A MULTI-FAMILY DWELLING ABOVE (SEVEN (7) DWELLING UNITS). BUILDING IS FULLY SPRINKLERED. SCISSOR STAIRWAY ENCLOSURE TO CONTAIN TWO STANDPIPES WITH EACH RESPECTIVE ENCLOSURE TO ENSURE THERE IS NO PENETRATION OF SCISSOR STAIRWAY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 16 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2009 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2017
TO AMEND PERMIT NUMBER 300337 (EXTENDED BY PERMIT NUMBER 501781) FOR THE RECONFIGURATION OF THE INTERIOR FLOOR PLAN, RELOCATION OF FIRE COMMAND CENTER (AS APPROVED BY THE PHILADELPHIA FIRE DEPARTMENT AND CHANGES TO APPROVED WALL TYPES. SEPARATE PERMITS REQUIRED FOR CHANGES TO PLUMBING, MECHANICAL, ELECTRICAL OR FIRE SUPPRESSION.City of Philadelphia · 2016
REVISE PERMIT# 411438 TO REFLECT REVISED LAYOUT FOR USE AS A HOTEL. REVISIONS INCLUDE ADDITION OF ACCESSIBLE TYPE A AND B UNITS, PWD APPROVAL FOR USE CHANGE, NO CHANGES PERFORMED TO BUILDING ENVELOPE, ALL EXTERIOR WALLS TO BE OF NON COMBUSTIBLE CONSTRUCTION OR FIRE RETARDANT TREATED LUMBER, SPRINKLERS AND STANDPIPES PROPOSED (NFPA 13,14)
CODE DESIGN PROFESSIONAL: CRAIG DEUTSCH, RACity of Philadelphia · 2014
REVISE PERMIT# 411438 TO SHOW SELECT FLOOR AND WALL ASSEMBLY CHANGES NOTED ON SHEET CS.1. NO OTHER APPROVALS COVERED IN THIS PERMIT.City of Philadelphia · 2013
Permitted projects on public record. Addresses are omitted for privacy.