What the public permit record shows, not self-reported reviews.
Is TUNGYEE LTD INC a real contractor?
TUNGYEE LTD INC appears in public building-permit records with 16 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is TUNGYEE LTD INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to TUNGYEE LTD INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is TUNGYEE LTD INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. TUNGYEE LTD INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is TUNGYEE LTD INC's work?
The most recent permit on record for TUNGYEE LTD INC is dated 2026-05-03, with 16 permits on file in total.
For interior alterations to an existing attached structure to convert for the use as a two-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only.City of Philadelphia · 2026
Installation of new commercial kitchen hood, exhaust fan and make up air unit as per approved plans.City of Philadelphia · 2026
FOR THE LEVEL II INTERIOR ALTERATIONS TO AN EXISTING RESTAURANT SPACE ON THE FIRST FLOOR OF AN EXISTING BUILDING. ALL WORK TO BE DONE PER APPROVED PLANS. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
Residential - Household Living - Two-FamilyCity of Philadelphia · 2025
For interior alterations to an existing attached structure to create a second dwelling unit per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work.
Amend permit 8-13-2025 to document keeping the original windows in the basement level.City of Philadelphia · 2025
FOR THE ERECTION OF ONE STATICALLY ILLUMINATED ACCESSORY WALL SIGN. SIZE AND LOCATION AS SHOWN IN PLANS.City of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you TUNGYEE LTD INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
For the erection of a temporary structure in the right of way for use as restaurant seating.
Separate Permit(s) required if new electrical connections or HVAC equipment is proposed.
Upon issuance of this permit, the restaurant's Temporary Sidewalk Café/Streetery License must be amended to document the approval of the structure. Please submit this permit to https://form.jotform.com/203103777242045
City of Philadelphia · 2023
**MAKE SAFE PERMIT** FOR THE EXTERIOR REPAIR OF THE EXISTING TWO (2) STORY MASONRY STRUCTURE TO COMPLY WITH VIOLATION CASE # 671169. ALL THE REPAIR WORK SHALL BE DONE AS PER THE ENGINEERING REPORT PROVIDED BY AN ENGINEER, LICENSED AND REGISTERED IN THE STATE OF PA. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK IF REQUIRED. 21 DAY POSTING & NOTICE WAIVED PER A-303.2City of Philadelphia · 2023
Interior fit out for 2 apartments in existing 3 story building. To include new facade.City of Philadelphia · 2021
Replace windows, window sill and window lintel on fa?ade of 3 story single family dwelling per plans.City of Philadelphia · 2021
For the erection of a temporary structure in the right of way for use as restaurant seating. Separate Permit(s) required if new electrical connections or HVAC equipment is proposed. Upon issuance of this permit, the restaurant's Temporary Sidewalk Cafe / Streetery License must be amended to document the approval of the structure. Please submit this permit to https://form.jotform.com/203103777242045City of Philadelphia · 2021
INTERIOR AND EXTERIOR RENOVATION IN EXISTING THREE (3) STORY BUILDING IN ACCORDANCE WITH THE IEBC 2018 PRESCRIPTIVE METHOD;
.
**SEPARATE PERMITS REQUIRED FOR MEP**
AMENDED AS OF 7.26.2021:
FOR REPLACEMENT OF BASEMENT SLAB AND REPLACE EXISTING WINDOW LINTELS.City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.