• Supply and install pool bonding.
• Supply and install conduit for swimming pool motors, pool light and GFCI receptacles.
• Supply and install GFCI breaker per NEC code
GM-2025-010936
• Supply all related materials needed to complete the scope of the work.City of Philadelphia · 2025
Supply and install pool bonding. Supply and install conduit for swimming pool motors, pool light and GFCI receptacles. Supply and install GFCI breaker.
ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.City of Philadelphia · 2025
• Supply and install pool bonding.
• Supply and install conduit for swimming pool motors, pool light and GFCI receptacles.
• Supply and install GFCI breaker per NEC code
• Supply all related materials needed to complete the scope of the work.City of Philadelphia · 2025
• Supply and install pool bonding.
• Supply and install conduit for swimming pool motors, pool light and GFCI receptacles.
• Supply and install GFCI breaker per NEC code
• Supply all related materials needed to complete the scope of the work.City of Philadelphia · 2025
Electrical Permit for combo RP-2023-012225City of Philadelphia · 2025
(1) 320KW BTC POWER TOWER, (1) DCFC BETA CHARGE CUBE, (1) DUAL PORT LEVEL 2 CHARGER, (1) 600A DISTRIBUTION CABINET, (3) HAND HOLES , 1200A SWITCHBARD- ALL WORK I TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.City of Philadelphia · 2024
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Supply and install wiring for the following electrical service needed to connect pool equipment.
o (3) main swimming pool lights.
o (1) spa light
o (1) pool heater connection
o (1) pool pump connection
o (1) spa pump connection
o (1) spa blower connection
GM-2024-003458
City of Philadelphia · 2024
Electrical Permit for combo CP-2023-003879City of Philadelphia · 2023
Supply and install pool bonding.
Supply and install conduit for swimming pool motors, pool lights, and GFCI receptacles.
Supply and install GFCI breaker per NEC 2017 code.City of Philadelphia · 2023
• Remove customer’s existing equipment 15kv metering, main switch and (4) additional switches in line with service disconnect to the other section of complex.
• Supply and install new 15kw high voltage distribution equipment; main, breaker, PECO metering cabinet and (6) new switches for power supply to other section of complex and existing services.
• Relocate wiring as needed from the existing underground service to new 15kw switches. This will be reviewed during pre-inspection and equipment lay out.
• New cabinets to be mounted to 8” rail to gain height to prevent water damage to equipment. (8” height was advised by customer at site)
As per APPROVED DRAWINGS-2017 nec.City of Philadelphia · 2022
• Supply and install (1) Class-5, 35-foot utility pole at location marked at site meeting.
• Supply and install (1) pedestal for electric meter mounted and outdoor rated breaker enclosure for 120/240 volt circuit for heater unit located in pump cabinet.
• Locate conduit, install wiring from panel to heater plate; complete all electrical connections as needed.
As per 2017 nec
ELECTRICAL SERVICE TO HOOK UP CUSTOMER'S HEATER - NO INTERIOR WIRING - HEATER ALREADY INSTALLEDCity of Philadelphia · 2022
•Supply and install pool bonding.
•Supply and install conduit for swimming pool motors, pool light and GFCI receptacles.
•Supply and install GFCI breaker per NEC code
•Supply all related materials needed to complete the scope of the work.
As per 2014 necCity of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.