What the public permit record shows, not self-reported reviews.
Is TITAN CONSTRUCTION INC a real contractor?
TITAN CONSTRUCTION INC appears in public building-permit records with 19 permits filed through 2021 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is TITAN CONSTRUCTION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to TITAN CONSTRUCTION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is TITAN CONSTRUCTION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. TITAN CONSTRUCTION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is TITAN CONSTRUCTION INC's work?
The most recent permit on record for TITAN CONSTRUCTION INC is dated 2021-04-09, with 19 permits on file in total.
For level 2 alterations for interior fitout of existing tenant space 5747 in existing strip mall at 5701 N BROAD ST as per plans. Bollards to be installed where shown in sidewalk outside of storefront.
Amendment (6/30) mechanical changes as per plans.City of Philadelphia · 2021
For level 2 alterations for interior fitout of existing tenant space 5747 in existing strip mall at 5701 N BROAD ST as per plans. Bollards to be installed where shown in sidewalk outside of storefront.
Amendment (6/3/2021) To revise layout of basement to add an additional egress as per revised plans.City of Philadelphia · 2021
For fit-out of a mechanical/HVAC system for a Group M tenant ("Gamestop" at Space #8 at Fishtown Crossing) within an existing single-story detached structure, as per plans; see CP-2020-001368 for associated building permit.City of Philadelphia · 2020
For Level II Alterations to fit-out an existing vacant commercial space to a Group M occupancy within Space #8 as part of Fishtown Crossing shopping center, as per plans; separate permits required for all MEP/FSP work; building fully sprinklered as per NFPA 13; no change to existing exterior envelope or to existing tenant demising walls; no signs on this permit; see ZP-2020-001302 for use registration permit.City of Philadelphia · 2020
LEVEL II INTERIOR ALTERATIONS TO FIT-OUT RETAIL SPACE #2045 IN THE AN EXISTING SHOPPING MALL AS PER APPROVED PLANS. BUILDING FULLY SPRINKLERED.
SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK.City of Philadelphia · 2020
FOR TENANT FITOUT TO SPACE CO65 AS PER APPROVED PLANS. FOR ISSUANCE OF CERTIFICATE OF OCCUPANCY. SEPARATE PERMIT REQUIRED FOR ANY M.E.P. AND FIRE SUPPRESSION WORK.
** IBC 2009 **
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you TITAN CONSTRUCTION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to TITAN CONSTRUCTION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2019
90 DAY TEMPORARY CERTIFICATE OF OCCUPANCYCity of Philadelphia · 2018
FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A MERCANTILE OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND FURNISHINGS THROUHGOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.City of Philadelphia · 2018
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. PLEASE SEE AP#850270 FOR APPROVED DOCUMENTATION.City of Philadelphia · 2018
EXTERIOR RENOVATION TO GLASS FRONT PER PLANSCity of Philadelphia · 2016
FOR THE INSTALLATION OF AN HVAC SYSTEM TO INCLUDE REGISTERS/DIFFUSERS, SUPPLY/EXHAUST DUCTWORK, SPLIT SYSTEM HEAT PUMP, AND ALL OTHER WORK AS PER APPROVED PLANS.City of Philadelphia · 2016
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2015
Permitted projects on public record. Addresses are omitted for privacy.