What the public permit record shows, not self-reported reviews.
Is THINKGREEN LLC a real contractor?
THINKGREEN LLC appears in public building-permit records with 15 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is THINKGREEN LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to THINKGREEN LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is THINKGREEN LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. THINKGREEN LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is THINKGREEN LLC's work?
The most recent permit on record for THINKGREEN LLC is dated 2026-01-30, with 15 permits on file in total.
FOR THE EXCAVATION WORK AND EARTH DISTURBANCE ASSOCIATED WITH THE INSTALLATION OF SUBSURFACE STORMWATER SYSTEM PER APPROVED PLANS.City of Philadelphia · 2026
FOR THE ERECTION OF A PRE-MANUFACTURERED STRUCTURE AND A DECK AS PER APPROVED PLANS.City of Philadelphia · 2025
FOR SITE WORK AS PER APPROVED PLANS.City of Philadelphia · 2025
FOR THE ERECTION OF A PRE-MANUFACTURERED STRUCTURE AND A DECK. SIZE AND LOCATION AS SHOWN IN THE APPLIACTION / PLANS.City of Philadelphia · 2025
FOR THE CREATION OF A PLAYGROUND AREA TO ACCOMMODATE AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. **WORK TO BE IN ACCORDANCE WITH THE ACCESSIBILITY REQUIREMENTS PER ICC A117.1**IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.** EXTERIOR WORK ONLY**City of Philadelphia · 2024
FOR THE INSTALLATION OF PLAYGROUND EQUIPMENT AND STRUCTURES WITH ASSOCIATED SITE WORK AS PART OF A GROUP E EDUCATIONAL FACILITY AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE ZP-2022-001801 FOR ZONING APPROVAL.City of Philadelphia · 2022
FOR EXTERIOR WORK ONLY. FOR A SITE IMPROVEMENT AS PER APPROVED PLANS.City of Philadelphia · 2021
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you THINKGREEN LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR INSTALLATION OF OUTDOOR PLAY EQUIPMENT,PLAYGROUND MULCH, CONCRETE WALKWAY AND PLANTING ACCESSORY TO EXISTING SCHOOL AS PER APPROVED PLAN.City of Philadelphia · 2021
FOR THE ERECTION OF A ONE (1) STORY DETACHED STRUCTURE CONSTRUCTED FROM SHIPPING CONTAINERS AND A WOOD FRAME ROOF PER PLANS. STRUCTURE FOR USE AS A COMMUNITY GARDENS TOOL LENDING LIBRARY. WORK INCLUDES SPECIAL INSPECTIONS FOR WELDING AND ANCHORS CAST IN CONCRETE.City of Philadelphia · 2019
FOR THE CONSTRUCTION OF A GREENHOUSE, AS PART OF AN EXISTING COMMUNITY GARDEN, AS PER APPROVED PLANS.City of Philadelphia · 2018
FOR THE INSTALLATION OF AN EXHIBIT AS SHOWN PER APPROVED PLANS, ALL PARTS OF THE EXHIBITS TO BE REMOVED FROM 6 MONTHS OF INSTALLATION AS REFERENCED IN SUBMITTED DOCUMENTATION. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2018
FOR THE INSTALLATION OF TWO FREE STANDING SIGNS ON EXISTING PIERS AS SHOWN PER APPROVED PLANS. ALL PLANS AND DOCUMENTATION UNDER AP#860586. STRUCTURAL CONNECTION TO BE COMPLETED AS PER SEALED PLANS BY STUART E. BERG P.E. SIGNS ACCESSORY TO PREVIOUSLY APPROVED PARK. PLEASE REFERENCE AP#860586 FOR APPROVED PLANS AND DOCUMENTATION.City of Philadelphia · 2018
Permitted projects on public record. Addresses are omitted for privacy.