What the public permit record shows, not self-reported reviews.
Is THE SULLIVAN COMPANY a real contractor?
THE SULLIVAN COMPANY appears in public building-permit records with 99 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is THE SULLIVAN COMPANY's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to THE SULLIVAN COMPANY by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is THE SULLIVAN COMPANY licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. THE SULLIVAN COMPANY has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is THE SULLIVAN COMPANY's work?
The most recent permit on record for THE SULLIVAN COMPANY is dated 2026-05-19, with 99 permits on file in total.
FOR INTERIOR ALTERATIONS ON THE FOURTH FLOOR OF AN EXISTING STRUCTURE TO INCLUDE NEW INTERIOR PARTITIONS AND INTERIOR FINISHES TO AN EXISTING EDUCATIONAL FACILITY
ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
FOR SLAB REPAIRS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY OTHER WORK.City of Philadelphia · 2026
FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO A PORTION OF THE 7TH FLOOR OF AN EXISTING STRUCTURE. FOR USE AS A BUSINESS OCCUPANCY. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING STRUCTURE. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. ** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**City of Philadelphia · 2026
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING LAB SPACE (ROOM 408) ON THE FOURTH FLOOR OF AN EXISTING HIGHER EDUCATIONAL FACILITY (SCIENCE CENTER) AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT.
FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS.
***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you THE SULLIVAN COMPANY?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to THE SULLIVAN COMPANY's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY ON 24TH AND 25TH FLOORS, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO CLASSROOM 104 INCLUDE PARTIAL DEMO AND INSTALLATION OF NEW FURRED WALL ASSEMBLY AND NEW WINDOW SASH. FOR USE AS PREVIOUSLY APPROVED.
ALL WORK TO BE DONE PER APPROVED PLANS.
***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************City of Philadelphia · 2025
FOR AN ALTERATION TO AN ENTRYWAY OF AN EXISTING STRUCTURE.** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO CONCOURSE AND 24TH FLOOR IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS.
***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************City of Philadelphia · 2025
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXPAND OFFICE SPACE ON THE 6TH FLOOR OF AN EXISTING BUILDING AS PER APPROVED PLANS AND PHC APPROVAL. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**City of Philadelphia · 2025
FOR THE INTERIOR DEMOLITION OF VACANT RETAIL SPACE AS PER APPROVED PLANS.City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.