What the public permit record shows, not self-reported reviews.
Is The Construx Group, LLC a real contractor?
The Construx Group, LLC appears in public building-permit records with 23 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is The Construx Group, LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to The Construx Group, LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is The Construx Group, LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. The Construx Group, LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is The Construx Group, LLC's work?
The most recent permit on record for The Construx Group, LLC is dated 2025-04-07, with 23 permits on file in total.
FOR THE RECONSTRUCTION OF A REAR ADDITION TO AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING; SIZE AND LOCATION AS PER APPLICATION/PLAN.City of Philadelphia · 2025
For interior and exterior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only.City of Philadelphia · 2025
FOR THE ERECTION OF AN ADDITION ABOVE AN EXISTING ATTACHED STRUCTURE AND FOR LEVEL 2 ALTERATIONS AS PER PLANS.
AMENDMENT (8/14/2022) TO CHANGE SPECIAL INSPECTION AGENCY PER THE REVISE SPECIAL INSPECTION DOCUMENTS.
AMENDMENT (10/04/2022) STRUCTURAL CHANGES TO INCLUDE DEMOLITION OF MASONRY CHIMNEY AND FRAMING AS PER REVISED PLANS.City of Philadelphia · 2022
CONSTRUCT A 3RD FLOOR ADDITION OVER EXISTING 2 STORY STRUCTURE. 3RD FLOOR INCLUDES BALCONY AND FRONT SETBACKCity of Philadelphia · 2019
REMOVE OLD BATHROOM AND REPLACE WITH NEW BATHROOM ON 3RD FL,REMOVE AND REPLACE CLOSET ON 3RD FL,INSTALL NEW BATHROOM ON 2ND FL,NEW FLOORING.TRIM, AND PAINTCity of Philadelphia · 2018
REMODEL 3RD FL ,NEW BATHROOM,NEW LAUDRY CLOSET,HARDWOOD FLOORING,TRIM, PAINTING AND KICHEN CABINETRY.City of Philadelphia · 2018
FOR INTERIOR ALTERATIONS TO AN EXISTING SPACE TO INCLUDE NEW INTERIOR PARTITION WALL INSTALLATIONS, AND WALL/FLOOR/CEILING FINISHING. (IEBC 2009, LVL II ALTERATIONS) **SEPARATE PERMITS TO BE REQUIRED FOR ELECTRICAL WORK.**
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you The Construx Group, LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to The Construx Group, LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2018
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION ON NON-BEARING PARTITION WALL AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS. **CONTRACTOR HAS NO EMPLOYEES PER NOTARIZED LETTER**City of Philadelphia · 2018
INTERIOR ALTERATIONS INSTALL KITCHEN CABINETS, TILES, APPLICANCES AND COUNTERTOPS. INSTALLATION OF SHEETROCK IN BATHROOM AND INTERIOR DEMO OF NON-LOADING WALLS. PAINT, TRIM DOORS AND SAND AND REFINISH FLOORS. APPLICANT AGREES TO LIMIT THE CONSTRUCTION TO COMPLY WITH EZ PERMIT STANDARD FOR INTERIOR ALTERATIONS, DATED JANUARY 2011. DEVIATION FROM THE STANDARD WILL RESULT IN REVOCATION OF THIS PERMIT AND IMPOSITION OF FURTHER PENALTIES. SEPARATE PLUMBING AND ELECTRICAL PERMITS.City of Philadelphia · 2017
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR THE PARTIAL DEMOLITION OF EXISTING REAR TWO STORY PORTION OF AN EXISTING ATTACHED SINGLE FAMILY (EXISTING IRC 2009 TOWNHOUSE) AND ERECTION OF NEW SECOND FLOOR REAR DECK AS PER APPROVED PLANS. BUILDING NOT REQUIRED TO BE SPRINKLERED.
**SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**City of Philadelphia · 2017
FOR THE REPLACEMENT OF AN EXISTING ROOF DECK TO INCLUDE DECK FRAMING AND GUARDRAIL INSTALLATIONS. **PHC TO REVIEW DECK RAILING MATERIAL. NO WORK ON CORNICE, FRONT FACADE, OR TRANSOM UNDER THIS PERMIT. SEPARATE PERMIT REQUIRED FOR ANY INTERIOR ALTERATIONS.**City of Philadelphia · 2017
EZ PERMIT STADARDS ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2017
Permitted projects on public record. Addresses are omitted for privacy.