What the public permit record shows, not self-reported reviews.
Is TERRA GROUP INC a real contractor?
TERRA GROUP INC appears in public building-permit records with 376 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is TERRA GROUP INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to TERRA GROUP INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is TERRA GROUP INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. TERRA GROUP INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is TERRA GROUP INC's work?
The most recent permit on record for TERRA GROUP INC is dated 2026-05-15, with 376 permits on file in total.
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Install 92% 80K BTU gas furnace, 3 ton AC, ductwork, and 12 diffusersCity of Philadelphia · 2026
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Installation of high efficiency 96% 80,000 btu gas furnace with 3 ton coil and 3 ton AC. Run all new ductwork. Furnace is located in basement. Condenser is located on the outside of the house.City of Philadelphia · 2026
Mechanical / Fuel Gas Permit for combo RP-2025-009442City of Philadelphia · 2026
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Install 3.5 ton air handler, 3.5 ton heat pump, 10 kW backup heat, all new ductwork, and 6 diffusersCity of Philadelphia · 2025
FOR THE INSTALLATION OF MIN-SPLIT SYSTEMS. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2025
Mechanical / Fuel Gas Permit for combo RP-2025-005415
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you TERRA GROUP INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Installation of (2) central air systems, new ductwork, and 16 diffusers.
System 1 will be located in the basement and servicing the basement, 1st, and 2nd floors. 92% 60k btu gas furnace with 2.5 ton AC.
System 2 will be located on the 3rd floor and servicing 3rd and 4th floors. 92% 60k btu gas furnace with 2.5 ton AC.City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Install (2) HVAC systems, (1) for each dwelling unit, ductwork, and 12 total diffusers. Each dwelling will have a 92% 60K BTU furnace and 2 ton AC.City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Install 92% 60K BTU gas furnace, 2.5 ton AC., all new ductwork, and 12 diffusers.City of Philadelphia · 2025
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, BATHROOM AND CLOTHES DRYER EXHAUSTS, AND ASSOCIATED DUCTWORK THROUGHOUT A THREE (3) FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-000887 FOR ASSOCIATED BUILDING PERMIT.City of Philadelphia · 2025
FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.