What the public permit record shows, not self-reported reviews.
Is TAMCO CONSTRUCTION INC a real contractor?
TAMCO CONSTRUCTION INC appears in public building-permit records with 37 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is TAMCO CONSTRUCTION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to TAMCO CONSTRUCTION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is TAMCO CONSTRUCTION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. TAMCO CONSTRUCTION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is TAMCO CONSTRUCTION INC's work?
The most recent permit on record for TAMCO CONSTRUCTION INC is dated 2025-08-18, with 37 permits on file in total.
COMPLETE DEMOLITION OF AN EXISTING DETACHED ONE-STORY, MASONRY, CONCRETE AND STEEL INDUSTRIAL BUILDING (BLDG 634) BY MECHANICAL METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2025
FOR THE COMPLETE DEMOLITION OF AN EXISTING STRUCTURES PER APPROVED PLANS. EXISTING STRUCTURES TO BE DEMOLISHED BY HAND-HELD AND MECHANICAL EQUIPMENT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
* NEWLY EXPOSED WALLS TO BE TREATEDCity of Philadelphia · 2025
FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY MECHANICAL METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.*ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK*City of Philadelphia · 2025
FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY MASONRY STRUCTURE (BUILDING #3A&3D). ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY MECHANICAL METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.*ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK*City of Philadelphia · 2025
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you TAMCO CONSTRUCTION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to TAMCO CONSTRUCTION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
PARTIAL DEMOLITION (MORE THAN 2/3RDS JOISTS) OF AN EXISTING DETACHED ONE-STORY, CONCRETE, MASONRY, STEEL AND WOOD INDUSTRIAL BUILDING (BLDG B) BY HAND METHODS TO SEPARATE AND MECHANICAL METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2024
FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY DETACHED STRUCTURE. DEMOLITION TO BE DONE WITH MECHANICAL DEMOLITION EQUIPMENT. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. 21 DAY POSTING & NOTICE REQUIRED PER A-303.2. FOUNDATIONS AND SLAB TO BE REMOVED IN ACCORDANCE WITH B-3303.12 AND SITE BACKFILLED IN ACCORDANCE WITH B-3303.4.1 OF THE PHILADELPHIA BUILDING CODE.
**ASBESTOS ABATEMENT REQUIRED**City of Philadelphia · 2024
FOR PARTIAL DEMOLITION OF EXISTING ONE (1) STORY STRUCTURE (BUILDING #3). ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE PER PLANS. DEMOLITION TO BE DONE BY HAND AND MECHANICAL METHODS. SEPARATE PERMIT REQUIRED FOR OTHER WORK.City of Philadelphia · 2024
FOR THE COMPLETE DEMOLITION OF THE DETACHED ONE-STORY STRUCTURE BY MECHANICAL METHOD. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *21 DAY POSING AND NOTICE REQUIRED PER A-303.2 *A SAFETY ZONE SHALL BE REQUIRED WITHIN MIN. 14 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC.*DUST CONTROL REQUIRED PER DEPARTMENT OF PUBLIC HEALTH.*Asbestos abatement required prior to start of the demolition work.City of Philadelphia · 2024
PERMIT FOR THE COMPLETE DEMOLITION OF ALL EXISTING STRUCTURES BY HAND AND HAND HOLD DEVICES AND MECHANICAL METHODS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *SEPERATE STREETS DEPARTMENT PERMIT REQUIRE FOR CLOSURE OF RIGHT OF WAY. *21 DAY POSING AND NOTICE REQUIRED PER A-303.2 *A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN MIN. 23 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC.* ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK.* DUST CONTROL REQUIRED PER DEPARTMENT OF PUBLIC HEALTH.City of Philadelphia · 2023
FOR THE COMPLETE DEMOLITION OF THE DETACHED ONE-STORY STRUCTURES BY HAND AND HAND HOLD DEVICES AND MECHANICAL METHODS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *SEPERATE STREETS DEPARTMENT PERMIT REQUIRE FOR CLOSURE OF RIGHT OF WAY. *21 DAY POSING AND NOTICE REQUIRED PER A-303.2 *A SAFETY ZONE CLOSURE SHALL BE REQUIRED WITHIN MIN. 7 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC.City of Philadelphia · 2023
FOR THE COMPLETE DEMOLITION OF A DETACHED STRUCTURE AS SHOWN ON APPROVED PLANS. STRUCTURE TO BE DEMOLISHED BY MECHANICAL EQUIPMENT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
* NEWLY EXPOSED WALLS TO BE TREATEDCity of Philadelphia · 2023
FOR THE PROPOSED DEMOLITION TO BE COMPLETED BY MECHANICAL MEANS AND HAND DEMOLITION. HAND DEMOLITION REQUIRED TO SEPARATE THREE STORY BUILDING. STRUCTURAL ENGINEER TO OBSERVE EXISTING STRUCTURE DURING DEMOLITION ACTIVITY, IF SHORING IS REQUIRED, AN AMENDED PERMIT MUST BE OBTAINED. DEMOLITION TO ENCOMPASS THE DEMOLITION OF ONE EXISTING ATTACHED THREE STORY STRUCTURE WITH A TWO-STORY PORTION, MASONRY VACANT BUILDING TO BE DEMOLISHED BY MECHANICAL AND HAND DEMOLITION AS SHOWN PER SEALED PLANS.**SPECIAL INSPECTOR TO REMAIN ON SITE DURING MECHANICAL DEMOLITION ACTIVITY.** PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 14 FEET OF BUILDING FACADES IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.*
IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.