INSTALL A 80KW 120 /240V / 1 PHASE GENERATOR, 125 AMP/2P NEMA-3R ENCLOSED CIRCUIT BREAKER, 200 AMP / 120/240V 1 PHASE NEMA-3R ATS, 60 AMP 120/240V 1 PHASE NEMA-3R PANEL, 200 AMP 120 / 240V 1 PHASE SERVICE RATED NEMA-3R ENCLOSED CIRCUIT BREAKER.
ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2023
Replace (3) 4,160 Volt high voltage switches with Square D Mini Break 5KV, 200A Load Interrupter Switches. Install new grounding to water pipe at entrance of building. Make all necessary electrical termination and connections . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.City of Philadelphia · 2023
Replace High Voltage Switches In Building # 2 per prints as per 2017 NEC.City of Philadelphia · 2023
Installing generator and transfer switch as per CD plans as well as all conduits and interconnecting wiring as per 2017 NEC.City of Philadelphia · 2023
Disconnect and remove existing 200 amp medium switch, pull the existing 5KV cables back to new splice box, install new 5 KW medium voltage switch and ground bar. work in accordance with 2017 NECCity of Philadelphia · 2022
Install 80 KW backup generator and transfer switch as per 2017 NEC.City of Philadelphia · 2022
Replace 5KV MV 200A switch . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.**SEPARATE FIRE ALARM PERMIT REQ'D**
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2022
Replace High Voltage Switch as per 2017 NEC.City of Philadelphia · 2022
Installation of circuits to support low voltage wireless equipment for distributed antenna system as per 2017 NEC
1. Refer to construction drawings pg. A103. Installation of (2) Each 220VAC 30 AMP receptacle circuits in 1" conduits from existing electrical panel in Headend room to provide new NEMA L5-15 4 gang receptacles for power connection to T-Mobile Telco Rack.
2. Install (6) each low voltage power circuits and equipment via new 2" conduit paths from T-Mobile Telco rack (refer to construction drawings pg. A103) to each of the (6) DRAN zones (refer to construction drawings pg. A101) to power low voltage remote radios. Final routing to be coordinated with building management.City of Philadelphia · 2021
Installing 80KW generator as per 2017 NECCity of Philadelphia · 2021
Installing a generator and ATS switch for existing wireless cell tower. ALL WORK TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.PC-2020-021695 CELL TOWER PROPERTY CERTIFICATE.City of Philadelphia · 2021
INSTALL A 80KW /240V/1P GENERATOR WITH A 200 AMP/240V ATS. INSTALL A 125 AMP/ 2P SERVICE RATED CIRCUIT BREAKER, 60 AMP 120V/240V SINGLE PHASE PANEL. INSTALL A EPO BUTTON. ALL EQUIPMENT IS NEMA 3R RATED. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.