What the public permit record shows, not self-reported reviews.
Is SURETY MECHANICAL SERVICE INC a real contractor?
SURETY MECHANICAL SERVICE INC appears in public building-permit records with 46 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SURETY MECHANICAL SERVICE INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SURETY MECHANICAL SERVICE INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SURETY MECHANICAL SERVICE INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SURETY MECHANICAL SERVICE INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SURETY MECHANICAL SERVICE INC's work?
The most recent permit on record for SURETY MECHANICAL SERVICE INC is dated 2026-02-06, with 46 permits on file in total.
FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO REGISTERS, DIFFUSERS ON THIS PERMIT.* NO BUILDIGN ALTERATIONS/NO PARENT PERMIT ASSOCIATED WITH THIS PERMIT *City of Philadelphia · 2026
Replacement of 21 existing rooftop air-handling units at D-Ticketing and C-D Connector bridge, D-Hammerhead, and E-F Connector bridge, and replacement of existing equipment support at PHL International Airport. Project includes hydronic piping, controls, and structural support.City of Philadelphia · 2025
FOR ALTERATIONS TO THE PHILADELPHIA INTERNATIONAL AIRPORT ASSOCIATED WITH THE INSTALLATION/REPLACEMENT OF MECHANICAL AND PLUMBING SYSTEMS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
** ASBESTOS REMEDIATION REQUIRED **City of Philadelphia · 2025
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION. *ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK.*City of Philadelphia · 2025
Mechanical / Fuel Gas Permit for combo CP-2024-001395City of Philadelphia · 2025
FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTER/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SURETY MECHANICAL SERVICE INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SURETY MECHANICAL SERVICE INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
FOR ANEW MECHANICAL WORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. ** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.**City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE MODIFICATIONS TO THE EXISTING ROOF TO ACCOMMODATE THE REPLACEMENT ROOFTOP UNITS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
PHL Airport 1589.17 Sanitary Lift Station Upgrade - Plumbing
Demo Pipe & pumps in 11 Lift Stations
Replace Pipe and pumps in 11 Lift Stations. all piping must be metallic.City of Philadelphia · 2025
TO REMOVE AND REPLACE EXISTING ROOFTOP UNITS AND NEW DUCTWORK TO BE CONNECTED TO EXISTING DUCT RISERS AT TERMINAL E. ALL APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2024
FOR THE INSTALLATION OF NEW COOLING TOWER, PIPING AND PUMPS PER APPROVED PLANS.City of Philadelphia · 2024
Mechanical / Fuel Gas Permit for combo CP-2024-000990City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.