What the public permit record shows, not self-reported reviews.
Is STANLEY COOPER a real contractor?
STANLEY COOPER appears in public building-permit records with 60 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is STANLEY COOPER's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to STANLEY COOPER by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is STANLEY COOPER licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. STANLEY COOPER has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is STANLEY COOPER's work?
The most recent permit on record for STANLEY COOPER is dated 2026-02-12, with 60 permits on file in total.
Renovate (2) existing bathrooms , kitchen, and laundry room
Add new Master bath and 1st floor shower bath per attached plan dated 10/20/2025
15 FIXTURES.City of Philadelphia · 2026
Extend existing sanitary and domestic water to shower, toilet, lavatory sink, and bar sinkCity of Philadelphia · 2026
INTERIOR PLUMBING INSTALLATION TO REHAB CENTER. INSTALL DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO EXISTING METALLIC PIPING ROUGH TO FINISH. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. VENTING INSTALLED IN COMPLIANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK SYSTEM.City of Philadelphia · 2025
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.City of Philadelphia · 2025
Mechanical / Fuel Gas Permit for combo CP-2025-000435City of Philadelphia · 2025
**EZ PERMIT** FOR HVAC DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCE(S) AS PER ATTACHED EZ PERMIT STANDARDS. ANY DEVIATION FROM THESE STANDARDS OR WORK THAT EXCEEDS THE LIMITATIONS OF THESE STANDARDS WILL REQUIRE A MECHANICAL PERMIT WITH SUBMISSION OF HVAC CONSTRUCTION PLANS.City of Philadelphia · 2023
Install drain and water to (2) new kitchen sinks, (5) piece Master Bath, Powder Room, Laundry sink and washer hub drain, and replace water heater.
12 FIXTURES.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you STANLEY COOPER?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2023
REPLACE 1" BACKFLOW DEVICECity of Philadelphia · 2023
Interior renovation to (3) powder rooms, (3) bathrooms, kitchen, bar, laundry, future bath, and laundry on the 3rd floor
Note: Master Bath has (2) toilets, for a total of (8) toilets
See uploaded Fixture count
Interior renovation to (3) powder rooms, (3) bathrooms, kitchen, bar, washer box and laundry tub, future bath and laundry on the 3rd floor,
and one waste water pump
Note: Master Bath has (2) toilets, for a total of (8) toilets
26 fixtures total
See uploaded Fixture countCity of Philadelphia · 2023
Extend existing sanitary and domestic water supply to (3) new bathrooms and (1) kitchen sink w/ dishwasher
Install tankless water heaterCity of Philadelphia · 2023
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Replace gas furnace, AC unit, and relocate supply ducts to 3 bathrooms.City of Philadelphia · 2023
REPLACE 3/4" BACKFLOW DEVICECity of Philadelphia · 2023
Permitted projects on public record. Addresses are omitted for privacy.