What the public permit record shows, not self-reported reviews.
Is SPEEDWELL CONSTRUCTION a real contractor?
SPEEDWELL CONSTRUCTION appears in public building-permit records with 14 permits filed through 2022 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SPEEDWELL CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SPEEDWELL CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SPEEDWELL CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SPEEDWELL CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SPEEDWELL CONSTRUCTION's work?
The most recent permit on record for SPEEDWELL CONSTRUCTION is dated 2022-05-18, with 14 permits on file in total.
For the erection of two order canopy structures on the existing site accessory to the existing restaurant as per approved plans.City of Philadelphia · 2022
FOR NEW CONSTRUCTION OF A ONE-STORY BUILDING PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SPRINKLER.City of Philadelphia · 2022
FOR THE ERECTION OF ONE (1), FOUR-STORY DETACHED STRUCTURE ; FOR A VISITOR ACCOMODATIONS FROM FIRST FLOOR THROUGH FOURTH(4TH) FLOORS ( 122 UNITS) ;FOR THE REMOVAL OF TEN(10)ACCESSORY PARKING SPACES AND FOR THE CREATION OF NINETY-NINE(99) ACCESSORY PARKING SPACES; FIVE(5) ACCESSIBLE SPACES INCLUDING WITH ONE(1) VAN ACCESSIBLE SPACE AND SIX(6) BICYCLE SPACES (TOTAL 538 SPACES INCLUDING WITH 17 ADA SPACES ON LOT).** ENTIRE BUILDING TO BE SPRINKLERED AS PER NFPA 13.STANDPIPE SYSTEM TO BE INSTALLED IN EXIT STAIRWAYS AS PER NFPA 14**IBC 2018 **SEPARATE PERMIT REQUIRED FOR ANY MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK**AMENDED AS OF 2/24/2021 FOR MODIFICATION TO THE FIRST FLOOR LAYOUT AS PER APPROVED AMENDED PLANS**City of Philadelphia · 2020
FOR INTERIOR ALTERATIONS FOR THE FITOUT OF A TENANT SPACE FOR A MERCANTILE USE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2019
FOR PROPOSED FUEL GAS PIPING WITHIN EXISTING GROCERY STORE, AS PER APPROVED PLANS.City of Philadelphia · 2018
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SPEEDWELL CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SPEEDWELL CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
REQUEST FOR TEMP CERTIFICATE OF OCCUAPNCYCity of Philadelphia · 2018
FOR THE CONSTRUCTION OF A RETAIL BUILDING, AS PER APPRVED PLANS. SEE APP# 830630 FOR APPROVED PLANS.City of Philadelphia · 2018
NEW CONSTRUCTION OF FOUNDATIONS ONLY FOR A NEW RETAIL BUILDING AS PER APPROVED PLANS. *SEPARATE PERMITS REQUIRED FOR CONSTRUCTION OF REMAINDER OF BUILDING*City of Philadelphia · 2017
NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. INTERIOR ALTERATIONS TO INCLUDE STRUCTURAL WORK, FOUNDATION/CONCRETE SLAB WORK, FRAMING WORK, NEW NON LOAD BEARING PARTITIONS, TENANT FIT-OUT, UPGRADES TO FINISHES, BUILDING ENVELOPE WORK AND ALL OTHER INTERIOR WORK AS PER APPROVED PLANS. EXTERIOR ALTERATIONS TO INCLUDE IN SITE WORK FOR PAVEMENT GRADING/ACCESSIBILITY REQUIREMENTS. SEPARATE PERMIT REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK. ALL SPECIAL INSPECTORS TO BE QUALIFIED AS PER CHAPTER 17 OF THE 2009 IBC. *PROFESSIONAL ENGINEER [ROBERT WIGLEY] TO BE ON SITE FOR STRUCTURAL SPECIAL INSPECTION ITEMS AND WELDER TO PROVIDE QUALIFICATIONS ON SITE TO INSPECTOR (FOR WELDS COVERED UNDER AWSD1.1)* ALL COMBUSTIBLE MATERIAL IN TYPE IIB CONSTRUCTION SHALL BE FIRE RETARDANT TREATED WOOD PER SECTION 603.1 OF THE 2009 IBC. NO RECONFIGURATION OF PARKING ON THIS APPLICATION.City of Philadelphia · 2015
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS. **POST THIS PERMIT** **POST THE PROJECT INFORMATION**City of Philadelphia · 2015
FOR LEVEL III ALTERATIONS TO AN EXISTING BUILDING FOR USE AS RETAIL GROCERY STORE. ALTERATIONS TO INCLUDE RENOVATIONS TO FRONT FACADE AND SIDWALK AREA, AND INTERIOR RENOVATIONS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR SIGNAGE, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.City of Philadelphia · 2015
FOR LEVEL III ALTERATIONS TO EXISTING MECHANICAL SYSTEM THROUGHOUT STRUCTURE FOR USE AS A MERCANTILE. ALTERATIONS TO INCLUDE THE REMOVAL/INSTALLATION OF REGISTER, DIFFUSERS AND MECHANICAL EQUIPMENT WITH ASSOICATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2015
Permitted projects on public record. Addresses are omitted for privacy.