What the public permit record shows, not self-reported reviews.
Is SOUTHLAND INDUSTRIES, INC. a real contractor?
SOUTHLAND INDUSTRIES, INC. appears in public building-permit records with 28 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SOUTHLAND INDUSTRIES, INC.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SOUTHLAND INDUSTRIES, INC. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SOUTHLAND INDUSTRIES, INC. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SOUTHLAND INDUSTRIES, INC. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SOUTHLAND INDUSTRIES, INC.'s work?
The most recent permit on record for SOUTHLAND INDUSTRIES, INC. is dated 2026-05-21, with 28 permits on file in total.
Furnish and install all necessary sanitary, vent, and domestic water piping on the 8th and 9th floors for (9) WC-1
(22) WC-2, (10) L-1, (22) L-2, (55) SK-1, (2) SK-2, (3) UR-1, (1) MR-1, (3) CS-1, (1) EWC-1, (24) Floor Drains with traps, and (2) Electric Water Heaters.City of Philadelphia · 2026
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2026
AMENDED 05.01.26 TO ADD THE Furnish and install all sanitary, venting, and domestic water piping for (2) new water closets and
(2) new lavatories in same area as pantry space.
Furnish and install all required sanitary, venting, domestic cold, and domestic hot water for one (1) new pantry sink and one (1) ice maker/water dispenser with funnel drain in cabinet.City of Philadelphia · 2026
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2026
Demo existing sanitary, vent, and domestic water of existing kitchen in existing auditorium space. Furnish and Install (2) water closets, (2) lavatories, (1) water cooler, and (1) 30 gallon water heater.City of Philadelphia · 2026
FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SOUTHLAND INDUSTRIES, INC.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SOUTHLAND INDUSTRIES, INC.'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2026
FOR INSTALLATION OF COMMERCIAL KITCHEN EXHAUST HOOD, EXHAUST AND MAKE-UP AIR FANS, DUCTWORKS AND REGISTERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.City of Philadelphia · 2025
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR ALTERATIONS TO AN EXISTING HVAC SYSTEM TO INCLUDE NEW APPLIANCES, NEW GRDs, AND RELOCATION OF EXISTING GRDs WITH ASSOCIATED DUCTWORK AND PIPING. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND APPLIANCE MANUFACTURER SPECIFICATIONS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.City of Philadelphia · 2024
FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO REGISTERS, DIFFUSERS ON THIS PERMIT.City of Philadelphia · 2024
FOR THE INSTALLATION OF EQUIPMENT PAD IN THE YARD FOR PLACING THE MECHANICAL DEVICES IN ASSOCIATION WITH THE MECHANICAL WORK INSIDE THE BUILDING PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL AND ELECTRICAL WORK.City of Philadelphia · 2024
Structural alterations to the roof of an existing hospital for the erection of additional steel dunnage on the roof of the building to support new mechanical equipment as per approved plans.City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.