What the public permit record shows, not self-reported reviews.
Is Smith HVAC LLC a real contractor?
Smith HVAC LLC appears in public building-permit records with 25 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Smith HVAC LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Smith HVAC LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Smith HVAC LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Smith HVAC LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Smith HVAC LLC's work?
The most recent permit on record for Smith HVAC LLC is dated 2025-12-12, with 25 permits on file in total.
Mechanical / Fuel Gas Permit for combo RP-2021-012688City of Philadelphia · 2025
Mechanical / Fuel Gas Permit for combo RP-2023-009208City of Philadelphia · 2023
Mechanical / Fuel Gas Permit for combo RP-2021-016387City of Philadelphia · 2023
Mechanical / Fuel Gas Permit for combo RP-2021-016391City of Philadelphia · 2023
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
New duct work, heaters, AC, thermostats and 34 registers. AC = Goodman GSX16 (3 units), 5 Ton, 18,000 BTU,16 SEER, Energy Star Certified.
Heater = Goodman GMEC96 (3 units), AFUE 96%, 40,000 BTU.City of Philadelphia · 2022
Mechanical / Fuel Gas Permit for combo RP-2022-004394City of Philadelphia · 2022
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2020
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Smith HVAC LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2019
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2019
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2019
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOR THE INSTALLATION IF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.City of Philadelphia · 2019
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.