INSTALL A NEW 200AMP 1-GANG METER ON SITE AS PER NEC 2008 (CELL SITE) NORTH DISTRICTCity of Philadelphia · 2014
REMOVE A DIGITAL E-MON METER AND INSTALL A NEW PECO UTILITY METER CAN FOR A SPRINT CELL SITE - WORK WILL BE IN COMPLIANCE WITH THE 2008 NECCity of Philadelphia · 2014
ERECTION OF ONE (1) 100' HIGH NON-COMBUSUTIBLE MONOPOLE TOWER (FOR WIRELESS) ON DEEP FOUNDATION WITH FENCING AND SCREENING. SIZE AND LOCATION AS SHOWN ON THE PLANS. SEPARATE PERMIT REQUIRED FOR ERECTION OF SHELTER BUILDING.City of Philadelphia · 2014
NEW CONDUIT FOR FIBER OPTIC CABLE AS PER NEDC 2008 (EAST DISTRICT)City of Philadelphia · 2013
NEW CONDUIT AND PULL STRONG FOR FUTURE FIBER OPTIC CABLE AS PER NEDC 2008 (CC DISTRICT)City of Philadelphia · 2013
INSTALL NEW 200AMP SERVICE, WIRING NEW 50KW GENERATOR, INSTALL & WIRE 4- 4' WRAP AROUND FIXTURES, 3-20AMP SUP RECPT, 1-EMER/EXIT LGT, 2-5 TON A/C, INSTALL 3 IN 1 INTERSECT PNL & GENERATOR RECPT AS PER NEC 2008 (CELL SITE)City of Philadelphia · 2013
200AMP ELECTRICAL SERVICE FROM NEW PECO METER TO EQUIPMENT PLATFORM ON FOORM 200AMP INTEGRATED LOAD CENTER, 3KW NATURAL GAS CONNECTION, 50AMP RADIO CABINET, MAINTENANCE LIGHTING, (12)ANTENNAS AND (12)LINES - PER THE 2008 NEC AND APPROVED PLANSCity of Philadelphia · 2013
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
NEW SERVICE TO BLDG FOR AT&T CELL SITE IN BASEMENT 200AMP SERVICE AS PER NEC 2008 (CELL SITE)City of Philadelphia · 2013
WIRE & RUN CONDUIT FOR NEW AT&T SITE IN BASEMENT OF BLDG FOR EUIPMENT WIRING AS PER NEC 2008 (CELL SITE)City of Philadelphia · 2013
AKA 12 E OREGON AVE - ELECTRICAL ALTERATIONS IN THE COMPUTER ROOM - WIRE THE AIR CONDITIONING UNIT IN THE COMPUTER ROOM AND THE REPLACEMENT OF AN EXISTING DRY COOLER - ALL WORK WILL COMPLY WITH THE 2008 NECCity of Philadelphia · 2013
ELECTRICAL ALTERATIONS IN COMPUTER ROOM AND ROOFTOP - WIRE THE AIR CONDITIONING UNIT IN THE COMPUTER ROOM AND THE INSTALLATION OF A ROOFTOP GPS ANTENNA - ALL WORK WILL COMPLY WITH THE 2008 NECCity of Philadelphia · 2013
CELL PHONE TOWER - NEW CONDUIT & PULL STRING FOR FIBER OPTIC CABLE. INNER DUCT & PULL STRING IN NEW CONDUIT FOR FUTURE CABLING - WORK WILL BE IN COMPLIANCE WITH THE 2008 NECCity of Philadelphia · 2013
Permitted projects on public record. Addresses are omitted for privacy.