What the public permit record shows, not self-reported reviews.
Is SIMPSON AND BROWN INC a real contractor?
SIMPSON AND BROWN INC appears in public building-permit records with 10 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SIMPSON AND BROWN INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SIMPSON AND BROWN INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SIMPSON AND BROWN INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SIMPSON AND BROWN INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SIMPSON AND BROWN INC's work?
The most recent permit on record for SIMPSON AND BROWN INC is dated 2026-02-02, with 10 permits on file in total.
Site / Utility Permit for CP-2025-004898City of Philadelphia · 2026
FOR STRUCTURAL WORK TO INCLUDE BENT AND TRESTLE SYSTEM TO SUPPORT DECK AS PER APPROVED PLANS. SEPARATECity of Philadelphia · 2025
FOR THE ERECTION OF A ONE (1) STORY DETACHED MODULAR BUILDING AND A FREESTANDING BOILER. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC AND MODULAR MANUFACTURER SITE INSTALLATION SPECIFICATIONS. SEPARATE PERMITS REQUIRED FOR M.E.P. WORK. SEPARATE APPROVAL FROM PA DEPARTMENT OF LABOR & INDUSTRY REQUIRED FOR BOILER INSTALLATION. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.City of Philadelphia · 2025
FOR NEW CONSTRUCTION OF A VEHICLE FUELING STATION. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.City of Philadelphia · 2024
Installation of a pre-manufactured, modular, one-story building in accordance with the submitted drawings to include concrete pad and foundations, exterior stairs, elevated support-structure for piping. Building is used for utility purposes to house equipment and instrumentation.City of Philadelphia · 2023
FOR THE ERECTION OF A DETACHED ONE-STORY STRUCTURE AS PER PLANS.City of Philadelphia · 2022
PES TANK 848 REPLACEMENT OF EMERGENCY SPILL SECONDARY CONTAINMENT LINER SYSTEM. THIS PERMIT APPLICATION IS FOR THE REMOVAL OF THE EXISTING SECONDARY CONTAINMENT LINER SYSTEM AND REPLACEMENT WITH AN UPGRADE IMPERVIOUS CLAY LINER SYSTEM. THERE ARE NO WATER, SANITARY OR STORM WATER SEWER CONNECTIONS REQUIRED AND THEREFORE THE PROJECT IS EXEMPT FROM ACT 537 REVIEW. PROJECT HAS BEEN APPROVED BY THE PWD STROMWATER PLAN UNIT (TRACKING NO. FY18-PEST-4981-01). WORK TO INCLUDE SITE WORK ONLY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SIMPSON AND BROWN INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SIMPSON AND BROWN INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2018
FOR THE INSTALLATION OF REINFORCED CONCRETE FOUNDATIONS FOR TWO PROCESS REACTORS AND PIPE FOUNDATIONS.870 LSG TIER II REINFORCED CONCRETE REACTOR FOUNDATION PADS AND PIPE FOUNDATIONS. FOUNDATIONS TO BE INSTALLED TO SUPPORT TWO CHEMICAL REACTORS, PROJECT HAS PWD STORMWATER REVIEW APPROVAL AS FIELD CHANGE 01(FY16-LSGT-4228-01 DATED 03/23/18). THERE ARE NOT WATER OR SANITARY SEWER CONNECTIONS REQUIRED AND THEREFORE THE PROJECT IS EXEMPT FROM ACT 537 REVIEW. THIS PROJECT HAS THE REQUIRED FAA CLEARANCE APPROVALS (2017-AEA-3729-OE AND 2017-AEA-3747-OE DATED 4/18/2017). ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2018
THE INSTALLATION OF 44 STEEL "H" PILES TO SUPPORT TWO PROCESS REACTORS AND PIPE RACKS. THE PROJECT HAS BEEN APPROVED UNDER ZONING PERMIT (AP #862073). THIS PROJECT HAS PWD STORMWATER REVIEW APPROVAL AS FIELD CHANGE 01 (FY16-LSGT-4228-01 DATED 03/23/18). THERE ARE NO WATER SANITARY SEWER CONNECTIONS REQUIRED AND THEREFORE THE PROJECT IS EXEMPT FROM ACT 537 REVEIW. THIS PROJECT HAS THE REQUIRED FAA CLEARANCE APPROVALS (2017-AEA-3729-0E AND 2017-AEA-3747-OE DATED 4/18/2017). ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2018
FOR THE ERECTION OF A FOUNDATION CONSISTING OF 86 STEEL H PILES AND RELATED SITE WORK FOR FUTURE INSTALLATION OF PROCESSING EQUIPMENT AND RACKS FOR LSG TIER III PROJECT, WITHIN "ZONE 1" (SEE AP#788260) OF INTENSIVE INDUSTRIAL SITE, AS PER PLANS AND SUPPLEMENTAL DOCUMENTS; NO OTHER WORK ON THIS PERMIT; CONTACT STRUCTURAL ENGINEER PRIOR TO START OF WORK IF THERE IS ANY VARIATION IN FIELD CONDITIONS; EARTH DISTURBANCE TO BE LESS THAN 5,000 SQUARE FEET; AREA OF WORK IS OUTSIDE THE 100-YEAR/ZONE AE FLOOD PLAIN.City of Philadelphia · 2017
Permitted projects on public record. Addresses are omitted for privacy.