What the public permit record shows, not self-reported reviews.
Is SHIFT BUILDERS LLC a real contractor?
SHIFT BUILDERS LLC appears in public building-permit records with 21 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SHIFT BUILDERS LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SHIFT BUILDERS LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SHIFT BUILDERS LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SHIFT BUILDERS LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SHIFT BUILDERS LLC's work?
The most recent permit on record for SHIFT BUILDERS LLC is dated 2025-09-11, with 21 permits on file in total.
FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS AND TO PROVIDE FINISHES/FURNISHINGS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR LEVEL III ALTERATION WITH PARTIAL CHANGE OF OCCUPANCY CLASSIFICATION TO CREATE LIMITED INDUSTRUAL AND TAKE-OUT RESTAURANT WITHIN THE EXISTING STRUCTURE. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK. ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF OTHER WORKS.
[AMENDMENT 3/3/2026 FOR STRUCTURAL REVISIONS INCLUDING ADJUSTED FOOTINGS AND COLUMN LINE RELOCATION, MASONRY REPAIRS, SLAB REPAIR AND REPLACEMENT, AND A REDUCTION IN THE SCOPE OF WORK WITH EXISTING CEILING IN PRIMARY SPACE TO REMAIN IN PLACE AS PER APPROVED AMENDED PLANS.]City of Philadelphia · 2025
FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN OCCUPANCY AT THE 1ST FLOOR OF A GROUP E EDUCATIONAL FACILITY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS AND TO PROVIDE FINISHES/FURNISHINGS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. IF FIELD CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
Eating and Drinking Establishments - Sit-Down RestaurantCity of Philadelphia · 2024
FOR THE REPLACEMENT OF HVAC APPLIANCES AND RECONFIGURATION OF THE GRILLES/REGISTERS/DIFFUSERS, BATHROOM EXHAUSTS, AND ASSOCIATED DUCTWORK IN THE TENANT SPACE AS SHOWN ON THE APPROVED PLANS. ALL WORK TO BE DONE AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO START OF WORK.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SHIFT BUILDERS LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SHIFT BUILDERS LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
MAKE SAFE PERMIT - For demolition of the canopy structure over existing loading dock and repair to exterior facade per approved plans to resolve case CF-2021-024778. Abutting sidewalk must be closed with fencing a minimum of 6’ in height. Separate Streets Department permit required for sidewalk closure. A Separate permit is required for any additional alterations that are not specifically addressed on case #CF-2021-024778. In accordance with Code Bulletin PM-1801, a PA professional engineer is required to monitor repairs made under this permit. The engineer must submit a sealed statement to the Department confirming that the structure is in sound condition at completion.”
AMENDMENT TO CHANGE PERIMETER FENCE FROM 8' ALUMINUM CYCLONE FENCE TO 8' PLYWOOD.City of Philadelphia · 2024
FOR STRUCTURAL WORK ONLY TO REBUILD THE EXISTING STRUCTURE REAR 2ND FLOOR AND ROOF FRAMING, ROOF JOIST TO REPLACED / SISTERRED. INSTALL 36 INCH WIDE STAIR. SIZE AND LOCATION AS PER PLAN.
***NEW SEPARATE PERMIT REQUIRED FOR ANY INTERIOR ALTERATIONS ** ELECTRICAL, PLUMBING AND MECHANICAL WORKS**.City of Philadelphia · 2023
FOR CHANGE OF OCCUPANCY AT 1ST FLOOR AND PARTIAL 2ND FLOOR AND LEVEL III ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
AMENDMENT 10/11/23 TO INCLUDE LAYOUT CHANGES, NEW PARTITIONS, EXTERIOR OPENING CHANGES, AND OTHER MINOR CHANGES AS PER PLANS.City of Philadelphia · 2023
FOR THE ERECTION OF A 102'-0" TALL 10-STORY ADDITION CONTAINING 24 NEW HOTEL GUEST ROOMS AS . THE ADDITION WILL BE INTEGRATED WITH ADJACENT EXISTING HISTORICAL "BEURY" BUILDING. THE BUILDING WILL BE CONSTRUCTED USING NON-COMBUSTIBLE MATERIALS, INCLUDING STEEL STRUCTURE, CONCRETE FLOOR SLABS, AND A MASONRY EXTERIOR ENVELOPE.City of Philadelphia · 2023
FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR THE USE OF A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORKCity of Philadelphia · 2022
INTERIOR ALTERATION TO THE 5TH FLOOR OF AN EXISTING STRUCTURE AS PER APRPOVED PLAN.
ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.City of Philadelphia · 2022
EZ PERMIT STANDARDS ALTERATIONS
For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS, UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT). ANY WORK/ALTERATIONS TO THE BASEMENT/CELLAR IS EXPRESSLY PROHIBITED UNLESS DOCUMENTED AS AN EXISTING HABITABLE SPACE WITH HEIGHTS AND MEANS OF EGRESS PER CONDITIONS OF THE EZ STANDARD. Separate permits required for Mechanical, Electric and Plumbing, ETC.
**ENGINEER LETTER IN APPLICATION DOCUMENTS**
**NO BASEMENT ALTERATIONS OF ANY KIND APPROVED**
Project is an interior fit out where you are removing the interior finishes, fixtures, and non-bearing walls and reconfiguring the space.
PER ENGINEER LETTERCity of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.