What the public permit record shows, not self-reported reviews.
Is SDA MECHANICAL SERVICES INC a real contractor?
SDA MECHANICAL SERVICES INC appears in public building-permit records with 49 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SDA MECHANICAL SERVICES INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SDA MECHANICAL SERVICES INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SDA MECHANICAL SERVICES INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SDA MECHANICAL SERVICES INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SDA MECHANICAL SERVICES INC's work?
The most recent permit on record for SDA MECHANICAL SERVICES INC is dated 2026-02-17, with 49 permits on file in total.
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2026
INSTALLATION OF NEW SCRUB SINK AND ASSOCIATED PIPING CONNECTING TO FUTURE CONNECTIONS. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPCCity of Philadelphia · 2025
FOR THE INSTALLATION OF HVAC EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS.City of Philadelphia · 2024
Mechanical / Fuel Gas Permit for combo CP-2023-002640City of Philadelphia · 2023
INSTALL NEW HVAC SYSTEM AT A GROUND FLOOR OF AN EXISTING STRUCTURE AS PER APPROVED PLAN. **2018 IMC REVIEW**
SEPARATE PERMIT SHALL BE REQUIRED FOR INSTALLATION OF AN APPROVED AUTOMATIC FIRE SUPRESSION SYSTEM***City of Philadelphia · 2023
FOR A NEW MECHANICAL INSTALLATION TO ACCOMODATE THE 2ND FLOOR OF AN EXISTING STRUCTURE. WORK TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2022
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SDA MECHANICAL SERVICES INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SDA MECHANICAL SERVICES INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Mechanical / Fuel Gas Permit for combo CP-2021-005458City of Philadelphia · 2022
Mechanical / Fuel Gas Permit for combo CP-2021-002956City of Philadelphia · 2021
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. Furnish and Install supply diffuser with flexible ductwork in 410C. Furnish and install return grill in 410E. Replace t-stats, and balance.City of Philadelphia · 2021
Fixture installationCity of Philadelphia · 2020
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.City of Philadelphia · 2020
Fixture installation toilet, lav & tub PPC 2018City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.