What the public permit record shows, not self-reported reviews.
Is SBG CONSTRUCTION LLC a real contractor?
SBG CONSTRUCTION LLC appears in public building-permit records with 11 permits filed through 2024 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SBG CONSTRUCTION LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SBG CONSTRUCTION LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SBG CONSTRUCTION LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SBG CONSTRUCTION LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SBG CONSTRUCTION LLC's work?
The most recent permit on record for SBG CONSTRUCTION LLC is dated 2024-08-15, with 11 permits on file in total.
legalize third floor roof deck, detail as shown on the plans.City of Philadelphia · 2024
FOR LEVEL I ALTERATIONS TO EXISTING APARTMENT UNITS C101, C102, C103, C201, C202, C203, C301, C302, C303, C401, C402, AND C403 AS PER APPROVED PLANS. WORK TO BE DONE IN ACCORDANCE WITH THE 2018 IEBC.City of Philadelphia · 2023
INTERIOR ALTERATION TO THE BATHROOM OF UNIT D8 IN AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2023
REPLACE AND REPAIR INTERIOR GYPSUM WALLBOARD DUE TO PLUMBING DAMAGE WITHIN APT B1 AS SHOWN ON PLAN. NO OTHER WORK THIS PERMIT. SEPARATE PERMIT REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2021
For replacement of existing exterior concrete stairs and landing for existing apartments.City of Philadelphia · 2021
FOR NEW CONSTRUCTION OF A THREE (3) STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY DWELLING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED (13D), SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. *PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.*ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
HVAC INSTALLATION IN ACCORDANCE WITH EZ PERMIT STANDARD.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SBG CONSTRUCTION LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SBG CONSTRUCTION LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2021
For level II alteration to the 3rd and 4th floor of the existing apartment building to create 42 dwelling units as per approved plans. Building to be fully sprinklered. Asbestos to be removed prior to occupancy. Separate permits required for M.E.P.S work.City of Philadelphia · 2021
FOR THE EXTENSION OF EXISTING STAIRWAYS TO ROOF WITH ROOF HATCHES FOR ACCESS TO ROOF AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2020
No change in use and occupancy classification. Exterior foundation work as per approved plans. All work shall be within property lines.City of Philadelphia · 2020
LEVEL II ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY AND ELEVATOR TOWER ADDITION TO CREATE THIRTEEN (13) DWELLING UNITS WITH OFFICE AND AMENITIES SPACE IN THE GROUND FLOOR LEVEL OF AN EXISTING BUILDING AS PER APPROVED PLANS. GROUND FLOOR TO BE FULLY SPRINKLERED.
**SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK**City of Philadelphia · 2015
DEMO KITCHEN AND BATHROOMS. DEMO NON BEARING INTERIOR WALL. INSTALL NEW KITCHEN AND BATH FIXTURES. REBUILD 2 HR.CHASE IN BATHROOM.REPLACE 90 MIN DOOD WITH CLOSER.NO CHANGE TO ROOM SIZESCity of Philadelphia · 2013
Permitted projects on public record. Addresses are omitted for privacy.