What the public permit record shows, not self-reported reviews.
Is RPS CONSTRUCTION a real contractor?
RPS CONSTRUCTION appears in public building-permit records with 136 permits filed through 2021 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is RPS CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to RPS CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is RPS CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. RPS CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is RPS CONSTRUCTION's work?
The most recent permit on record for RPS CONSTRUCTION is dated 2021-04-16, with 136 permits on file in total.
FOR THE COMPLETE DEMOLITION OF ONE EXISTING ATTACHED 2-STORY, VACANT RESIDENTIAL STRUCTURE BY HAND DEMOLITION ONLY; ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE.ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 4.5 FEET OF BUILDING FACADES IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.
* NOTIFICATIONS WAIVED DUE TO UNSAFE CASE FILE CF-2021-028000City of Philadelphia · 2021
**MAKE SAFE PERMIT** FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY MASONRY STRUCTURE TO COMPLY WITH VIOLATION CASE #624787. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. STREETS DEPARTMENT APPROVAL REQUIRED FOR ANY RIGHT-OF-WAY ENCROACHMENTS. 21 DAY POSTING AND NOTICE WAIVED PER A-303.2. MAKE SAFE PERMIT ONLY.City of Philadelphia · 2021
FOR THE COMPLETE DEMOLITION OF THE EXISTING ATTACHED STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, ADJACENT PROPERTIES, AND PUBLIC RIGHT-OF-WAY TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE. 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2. **ASBESTOS ABATEMENT REQUIRED.**City of Philadelphia · 2021
FOR THE COMPLETE DEMOLITION OF THE EXISTING ATTACHED STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, ADJACENT PROPERTIES, AND PUBLIC RIGHT-OF-WAY TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE. 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2. **ASBESTOS ABATEMENT REQUIRED.**
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you RPS CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to RPS CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2021
FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURE ON LOTCity of Philadelphia · 2021
FOR THE COMPLETE DEMOLITION OF EXISITNG STRUCTURE ON LOTCity of Philadelphia · 2021
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED STRUCTURE TO COMPLY WITH VIOLATION CASE #624787. SIZE AND LOCATION AS SHOWN ON PLANS. SEE DP-2021-000412 FOR PLANS.City of Philadelphia · 2021
FOR THE COMPLETE DEMOLITION OF EXISITNG STRUCTURE ON LOTCity of Philadelphia · 2021
COMPLETE DEMOLITION OF EXISTING BUILDINGS BY HAND AND MECHANICAL METHOD. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. FULL SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK.City of Philadelphia · 2021
For the complete demolition of an existing attached structure previously used as single-family household living, size and location as shown on plan/application.City of Philadelphia · 2021
FOR THE COMPLETE DEMOLITION OF EXISITNG STRUCTURE ON LOT.City of Philadelphia · 2021
FOR THE COMPLETE DEMOLITION OF A TWO-STORY DETACHED BUILDING AND A TWO-STORY SEMI-DETACHED BUILDING TO COMPLY CASE NO. 716334. A SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 6 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED. ANY DEVIATION FROM APPROVED PLAN WILL REQUIRE AN AMENDED BUILDING PERMIT. 21 DAY POSTING PERIOD WAIVED.
**SAFETY ZONE: 12 FT**City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.