What the public permit record shows, not self-reported reviews.
Is RONALD PIROLI a real contractor?
RONALD PIROLI appears in public building-permit records with 6 permits filed through 2021 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is RONALD PIROLI's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to RONALD PIROLI by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is RONALD PIROLI licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. RONALD PIROLI has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is RONALD PIROLI's work?
The most recent permit on record for RONALD PIROLI is dated 2021-01-25, with 6 permits on file in total.
MAKE SAFE PERMIT TO COMPLY WITH CASE#CF-2020-007787 TO INCLUDE REPAIRS TO AN EXISTING ATTACHED STRUCTURE AS PER APPROVED PLAN. REPAIRS TO PARTIALLY COLLAPSED EXTERIOR BALCONY AND REPLACEMENT OF ROOF COVERING MATERIAL WITH INKIND MATERIALS .SEPARATE PERMITS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #CF-2020-7787. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6’ IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE.City of Philadelphia · 2021
FOR THE AMENDMENT OF APPROVED PERMIT #953417, TO INCLUDE REMOVAL AND REPLACEMENT OF EXISTING EPDM ROOFING MEMBRANE AND RIGID INSULATION OVER ZONE 02 AND 03 ONLY WITH NEW RIGID INSULATION AND TPO ROOF.EXISTING STRUCTURAL FRAMING AND DECKING TO REMAIN. ORINGINAL PERMIT APPROVED FOR FOR LEVEL III ALTERATIONS TO AN EXISTING BUILDING FOR USE AS AN A-3 ASSEMBLY (YOUTH SPORTS FACILITY/TRAINING AND FITNESS CENTER). SCOPE OF WORK INCLUDES THE ERECTION OF PARTITION WALLS, STRUCTURAL RENOVATIONS, WITH INSTALLATION OF FINISHES/FURNISHINGS AND ACCESSIBLE IMPROVEMENTS THROUGHOUT. BUILDING IS SPLIT INTO THREE DIFFERENT FIRE AREAS VIA FIRE BARRIERS WITH THE FOLLOWING DESIGNATIONS: ZONE 1, ZONE 2, AND ZONE 3. ZONE 3 INCLUDES THE INSTALLATION OF A SECOND FLOOR LEVEL RESULTING IN SPRINKLER COVERAGE (NFPA 13) FOR ZONE 3 ONLY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2019
FOR THE AMENDMENT OF AP#953417 TO INCLUDE EXTERIOR STAIR AND EXIT DISCHARGE FROM MEZZANINE LEVEL IN ZONE 03. ORIGINAL PERMIT APPROVED FOR FOR LEVEL III ALTERATIONS TO AN EXISTING BUILDING FOR USE AS AN A-3 ASSEMBLY (YOUTH SPORTS FACILITY/TRAINING AND FITNESS CENTER). SCOPE OF WORK INCLUDES THE ERECTION OF PARTITION WALLS, STRUCTURAL RENOVATIONS, WITH INSTALLATION OF FINISHES/FURNISHINGS AND ACCESSIBLE IMPROVEMENTS THROUGHOUT. BUILDING IS SPLIT INTO THREE DIFFERENT FIRE AREAS VIA FIRE BARRIERS WITH THE FOLLOWING DESIGNATIONS: ZONE 1, ZONE 2, AND ZONE 3. ZONE 3 INCLUDES THE INSTALLATION OF A SECOND FLOOR LEVEL RESULTING IN SPRINKLER COVERAGE (NFPA 13) FOR ZONE 3 ONLY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you RONALD PIROLI?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2019
FOR LEVEL III ALTERATIONS TO AN EXISTING BUILDING FOR USE AS AN A-3 ASSEMBLY (YOUTH SPORTS FACILITY/TRAINING AND FITNESS CENTER). SCOPE OF WORK INCLUDES THE ERECTION OF PARTITION WALLS, STRUCTURAL RENOVATIONS, WITH INSTALLATION OF FINISHES/FURNISHINGS AND ACCESSIBLE IMPROVEMENTS THROUGHOUT. BUILDING IS SPLIT INTO THREE DIFFERENT FIRE AREAS VIA FIRE BARRIERS WITH THE FOLLOWING DESIGNATIONS: ZONE 1, ZONE 2, AND ZONE 3. ZONE 3 INCLUDES THE INSTALLATION OF A SECOND FLOOR LEVEL RESULTING IN SPRINKLER COVERAGE (NFPA 13) FOR ZONE 3 ONLY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2019
ERECTION OF A NEW THREE (3) STORY BUILDING, WITH BASEMENT, A ROOF DECK AND A ROOF ACCESS STRUCTURE. FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING AS PER PLANS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13D ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.(SEE A/P#879668 FOR PLAN AND APPLICATION)City of Philadelphia · 2019
ERECTION OF A NEW THREE (3) STORY BUILDING, WITH BASEMENT, A ROOF DECK AND A ROOF ACCESS STRUCTURE. FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING AS PER PLANS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13D ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.