What the public permit record shows, not self-reported reviews.
Is ROBERT A. MCCLENDON a real contractor?
ROBERT A. MCCLENDON appears in public building-permit records with 11 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ROBERT A. MCCLENDON's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ROBERT A. MCCLENDON by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ROBERT A. MCCLENDON licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ROBERT A. MCCLENDON has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ROBERT A. MCCLENDON's work?
The most recent permit on record for ROBERT A. MCCLENDON is dated 2025-11-10, with 11 permits on file in total.
FOR INSTALLATION OF HVAC APPLIANCE, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.City of Philadelphia · 2025
FOR INTERIOR ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING AS PER BUILDING APPLICATION/PLAN.City of Philadelphia · 2025
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2024
FOR ALTERATIONS AND THE CONSTRUCTION OF AN ADDITION ABOVE AN EXISTING ATTACHED STRUCTURE AS PER APPROVED PLANS FOR TWO-FAMILY HOUSEHOLD LIVING ON THE SECOND AND THIRD FLOOR AND A VACANT COMMERCIAL SPACE AT THE FIRST FLOOR. *SEPARATE CO NEEDED FOR VACANT SPACE PRIOR TO OCCUPANCY* *ABESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK.* *SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK.*City of Philadelphia · 2024
FOR THE ERECTION OF A 3RD FLOOR REAR ADDITION TO THE EXISTING ATTACHED STRUCTURE, SIZE AND LOCATION AS SHOWN ON THE PLANS.City of Philadelphia · 2023
EZ PERMIT STANDARDS ALTERATIONS - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab. NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR. Separate permits required for Mechanical, Electric and Plumbing. Demolition of existing flooring, install new flooring, demolition of non-bearing walls, new non-bearing walls, new Electric, plumbing, & HVAC (will hire licensed trade person, new paint & gypsum wallboard.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ROBERT A. MCCLENDON?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ROBERT A. MCCLENDON's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2021
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2021
EZ PERMIT STANDARDS ALTERATIONS - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab. NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR. Separate permits required for Mechanical, Electric and Plumbing. Demolition of existing flooring, install new flooring, demolition of non-bearing walls, new non-bearing walls, new Electric, plumbing, & HVAC (will hire licensed trade person, new paint & gypsum wallboard.City of Philadelphia · 2021
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2021
FULL GUT, REHAB, EXISTING STRUCTURE THE SAME. SEPARATE ELECTRICAL, MECHANICAL AND PLUMBING PERMITS REQUIRED.City of Philadelphia · 2021
MAKE SAFE PERMIT - For Make Safe - Repair front wall above door, add lintel and missing bricks, to resolve case #644356. Abutting sidewalk must be closed with fencing a minimum of 6’ in height. Separate Streets Department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case #644356. In accordance with Code Bulletin PM-1801, a PA professional engineer is required to monitor repairs made under this permit. The engineer must submit a sealed statement to the Department confirming that the structure is in sound condition at completion.”City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.