What the public permit record shows, not self-reported reviews.
Is RJR GROUP INC a real contractor?
RJR GROUP INC appears in public building-permit records with 139 permits filed through 2019 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is RJR GROUP INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to RJR GROUP INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is RJR GROUP INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. RJR GROUP INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is RJR GROUP INC's work?
The most recent permit on record for RJR GROUP INC is dated 2019-11-29, with 139 permits on file in total.
MAKE SAFE PERMIT- FOR (REPAIR OPENINGS IN FRONT AND REAR FACADES AND BREACH IN MAIN ROOF. ALSO, REROOF AS PER ENGINEER'S REPORT) TO RESOLVE CASE 699117 ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6' IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE 699117City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURES. STRUCTURES TO BE DEMOLISHED BY MECHANICAL EQUIPMENT AND HAND-HELD TOOLS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
* NEWLY EXPOSED WALLS TO BE TREATED
****REFERENCE AP# 1010928 FOR PLANS****City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURES. STRUCTURES TO BE DEMOLISHED BY MECHANICAL EQUIPMENT AND HAND-HELD TOOLS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
* NEWLY EXPOSED WALLS TO BE TREATEDCity of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN EXISTING BUILDING FOR USE AS A VACANT LOTCity of Philadelphia · 2019
DEMOLITION OF FLOOR AND ROOF JOISTS AND PORTIONS OF FRONT AND REAR EXTERIOR WALLS OF AN EXISTING ATTACHED THREE-STORY, MASONRY AND WOOD SINGLE FAMILY DWELLING BY HAND METHODS. NEW JOIST INSTALLATION TO IMMEDIATELY FOLLOW JOIST REMOVAL. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you RJR GROUP INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED ONE-STORY GARAGE. SIZE AND LOCATION AS SHOWN IN PLANS/ APPLICATION. FOR USE AS A VACANT LOT. SEE AP#985417 FOR PLANS.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF A ONE (1) STORY STRUCTURE USING HAND METHOD ONLY AS PER APPROVED PLANS. STREETS DEPARTMENT APPROVAL REQUIRED FOR PEDESTRIAN PROTECTION ON THE PUBLIC FOOTWAY PRIOR TO START OF WORK.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF A SEMI-DETACHED THREE-STORY STRUCTURE. A SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8.5 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. DEMOLITION WILL COMPLY CASE NO. 679110.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN EXISTING TWO STORY ATTACHED STRUCTURE (SEE PLAN UNDER BUILDING DEMO PERMIT #990412. LOT TO REMAIN VACANT.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN EXISTING THREE (3) STORY ATTACHED STRUCTURE USING HAND HELD DEVICES ONLY. STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE PRIOR TO START OF WORK.City of Philadelphia · 2019
MAKE SAFE PERMIT TO ADDRESS L&I UNSAFE CASE #642994; FOR THE COMPLETE DEMOLITION OF AN EXISTING TWO (2) STORY ATTACHED STRUCTURE (W/MASONRY EXTERIOR WALLS & INTERIOR WOOD FRAMING) PREVIOUSLY USED AS GROUP R-3 (SINGLE-FAMILY DWELLING), BY HAND AND WITH HAND-HELD TOOLS ONLY, AS PER SUBMITTED SITE SAFETY PLAN AND DOCUMENTATION; PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES; APPROVED SITE SAFETY PLAN MUST BE MAINTAINED ON SITE AT ALL TIMES DURING DEMOLITION; ANY DEVIATION FROM THE SUBMITTED PLAN AND DOCUMENTS WILL REQUIRE AN AMENDED BUILDING PERMIT.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8 FEET OF BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED STRUCTURE.FOR USE AS VACANT LOT.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.