What the public permit record shows, not self-reported reviews.
Is RIGGS DISTLER & CO INC a real contractor?
RIGGS DISTLER & CO INC appears in public building-permit records with 36 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is RIGGS DISTLER & CO INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to RIGGS DISTLER & CO INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is RIGGS DISTLER & CO INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. RIGGS DISTLER & CO INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is RIGGS DISTLER & CO INC's work?
The most recent permit on record for RIGGS DISTLER & CO INC is dated 2025-11-11, with 36 permits on file in total.
Installation of 600 amp service 2 set of 4 500kcmil
2/0 cold water groundCity of Philadelphia · 2025
For installation of a central fire alarm system in a previously approve warehouse project, with voltage calculations, equipment cutsheets, and locations as per the attached documents. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
Building permit under CP-2024-001528.City of Philadelphia · 2025
INSTALL SERVICE & TRANSFORMERS W/ TWO(2) 4000A SWITCHBOARDS AND FEEDER PANELS ,ALL LIGHTING,EM.LIGHTING FOR VANILLA BOX (WAREHOUSE) . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
SEPARATE ELECTRICAL PERMITS FIRE PUMP CONTROL CONTROLS FOR DIESEL ENGINE FIRE PUMP & FITOUT.
-NOTED ELECTRIC MOTOR DRIVEN FIRE PUMP DESIGN HAS BEEN CHANGED TO DIESEL ENGINE-
AMENDMENT : ADD ADDITIONAL ELECTICAL RM & SITE LIGHTING , CONTROL WIRING FOR FIRE PUMP CONTROLLER ,JOCKEY PUMP. (A PLAQUE WILL BE NEEDED AT EACH ELECTRICAL RM PER: 225.37 '17 NEC)City of Philadelphia · 2024
480V Service replacement w/ new transformers & gear ,w/ bollards and mechanical protection(as shown),all necessary grounding and bonding . ALL WORK IS TO BE DONE ACCORDING TO APPROVAED DRAWINGS-2017 NEC.City of Philadelphia · 2024
Cameras and SecurityCity of Philadelphia · 2024
Install all Electrical Power, Lighting, and Fire Alarm Alterations to include two (2) story addition to an existing educational facility as per approved plans. -2017 NEC,2016 NFPA-72.City of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you RIGGS DISTLER & CO INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to RIGGS DISTLER & CO INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR THE ERECTION OF A PRE-FABRICATED DETACHED ACCESSORY STRUCTURE IN ASSOCIATION WITH A BUTANE INJECTION / BLENDING FACILITY. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. BUILDING IS NOT SPRINKLERED. SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL, ELECTRICAL, AND PLUMBING WORK AND FOR BUTANE STORAGE TANK INSTALLATION. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.City of Philadelphia · 2024
Scope of work is limited to a new PECO Feeder to feed new trailer complex and existing Transformer as per 2017 NEC. As seen on the plans and details below.
Mobilize to Site
• Riggs Distler to Supply the Following Equipment
• (1) Transformer Vault
• (1) Meter Socket (PECO) w/ CTs
• (1) 200 Amp & (1) 400 Amp Fused Disconnect Switch
• To isolate each set of (6) Trailer Feeds
• Switches will be mounted a Unistrut Rack
• Install (4) 55’ Utility Poles (Supplied by Hilco)
• (1) Pole will be placed in the grass area outside the fence for PECO to Bring the Feed from their 13.2K pole line.
• PECO to install New Cutouts on Pole
• (3) Poles will be placed coming through the existing parking lot from the 1 st Pole to where the New Power Rack will be located.
• Ground Rods for Needed Poles
• Furnish & Install (Primary to PECO Tie-in Point) (3) 15KV #2 Cables that will be lashed onsite during installation to messenger wire.
• Furnish & Install All needed Load Break Elbows & Cold Shrink Terminations
• Furnish & Install New Raceway from New Power Rack to Refeed existing trailer complex
• Boring under Concrete Patio is by others
• Riggs’ Civil will excavate for the New PECO Vault
• Furnish & Install Ground Loop around the vault per PECO’s Spec
• Furnish & Install Support for Power Meter per PECO’s Spec
• Riggs ‘Civil will trench from the PECO Vault to the New Stepdown Transformer for the Trailer Rack
• Back Fill will be completed when all inspections are completed.
• Riggs to provide Sealed Drawings for Permits & Inspections
• De-MobilizeCity of Philadelphia · 2023
Set 1 - 45' Class 2 wood pole. Install 1 - 600V 3 phase 600 amp service rated fused disconnect. Install cable up the pole to PECO transformer. Install ground rods and grounding electrode conductors. Install PECO approved CT cabinet, meter can, & PECO CT's. Installed in accordance with the 2017 NEC.City of Philadelphia · 2023
FOR THE CONSTRUCTION OF NEW DRIVEWAY ACCESS WITH RETAINING WALLS AND FENCE GATE AS PER APPROVED PLANS. **SITE WORK ONLY**City of Philadelphia · 2023
Install 1200 AMP service for Temporary Waste Water Treatment Plant. Feed coming from an existing PECO pole on the facility ground.City of Philadelphia · 2023
West Side (Off Greenland Dr)
1. At new PECO pole install new meter and 200A disconnect switch.
2. At valve location, furnish and install a new switch rack with Scada panel and new power
panel.
3. Furnish and install grounding at new pole and new rack.
4. Furnish and install conduit and wire underground from new PECO pole to new switch
rack panel.
5. Furnish and install conduit and wire from new switch rack to new valve as shown on
drawing E-101.
6. Furnish and install light at switch rack.
7. Furnish and install gate switch.
East Side (Between Greenland Dr and Woodford Dr)
1. At existing PECO pole change service 200A. Install meter and 200A disconnect switch.
2. At valve location, furnish and install a new switch rack with Scada panel, new power
panel and relocated cathodic protection panel.
3. Furnish and install grounding at new pole and new rack.
4. Furnish and install conduit and wire underground from PECO pole to new switch rack
panel.
5. Furnish and install conduit and wire from new switch rack to new valve as shown on
drawing E-102.
6. Furnish and install light at switch rack.
7. Furnish and install gate switch.
ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.City of Philadelphia · 2023
Permitted projects on public record. Addresses are omitted for privacy.