What the public permit record shows, not self-reported reviews.
Is Response Electric, Inc a real contractor?
Response Electric, Inc appears in public building-permit records with 98 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Response Electric, Inc's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Response Electric, Inc by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Response Electric, Inc licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Response Electric, Inc has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Response Electric, Inc's work?
The most recent permit on record for Response Electric, Inc is dated 2025-07-24, with 98 permits on file in total.
Provide all electrical demolition as per demolition drawing sheet #4. Provide all new recessed lights (12), vanity fixtures (2), ceiling mount fixtures (2), switches (9), receptacles (9), exhaust fan (1), circuit for heated flooring, and circuit for heated towel bar as per electrical drawing sheet #7. All electrical installations shall be per the 2017 edition of the NEC code.City of Philadelphia · 2025
Provide and install replacement/like kind fire alarm devices in existing locations per provided drawings for the following: (1) intelligent fire alarm control panel, (1) NAC circuit extender panel, (1) duct detector, (1) smoke detector, (5) addressable modules, (1) remote annunciator, (9) dual action pull stations, (9) ceiling mount horn/strobes, (3) ceiling mount strobes, (7) wall mount strobes, and (17) wall mount horn/strobes. Provide all programming & inspections as required. Installation shall conform to latest adopted edition of the NEC (2017) and NFPA 72 (2016).City of Philadelphia · 2025
INSTALL FIRE ALARM SYSTEM ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.City of Philadelphia · 2025
Provide and install the following: 100 kW Emergency Generator with 400A/2P onboard breaker, 400A SER rated transfer switch, associated support conduits & circuitry as shown on drawings, remote annunciator for generator in building's existing utility closet, and concrete pad for generator. All work shall be completed in accordance with 2017 NEC Code.City of Philadelphia · 2024
Electrical Permit for combo SP-2023-000402. INSTALL THE PARKING LOT SITE LIGHTING BASES, POLES, CONDUIT & WIRING. THE CONDIUTS WILL STUB UP AT THE FUTURE BUILDING. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Response Electric, Inc?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Response Electric, Inc's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Provide and install fire alarm control panel, NAC power supply, tamper/flow switches for sprinkler, and all fire alarm devices per design plans. All work shall conform to the 2017 NEC, 2016 NFPA 72, and 2018 Philadelphia Fire Code.City of Philadelphia · 2024
Connect one (1) statically illuminated replacement flat wall sign to existing 120-V power supply in existing UL Listed Junction Boxes. We are not running any wiring or conduit, just connecting to existing, per plans. Sign Permit ZP-2024-002374 and GP-2024-004831City of Philadelphia · 2024
Partial removal of existing lighting and associated electrical within transfer station. Relocation of existing transformer and associated wiring. New lighting and wiring install in 10,000 sq. ft. addition to transfer station as per 2017 NEC.City of Philadelphia · 2024
Provide, install, commission, test, and certify replacement fire alarm system per completed permit drawing set. Work shall consist of the following one for one replacements: (1) FA panels, (1) NAC extender panel, (1) annunciator, (3) interface modules, (19) horn/strobes, (4) DA pull stations, (8) relay modules, (9) smoke detectors. All installations shall be per the 2017 NEC and 2016 NFPA 72.City of Philadelphia · 2023
Provide, install, commission, test, and certify replacement fire alarm system per completed permit drawing set.
Work shall consist of the following one for one replacements:
(1) FA panel, (1) power supply, (1) annunciator, (8) horn/strobes, (1) WP horn/strobe
(6) DA pull stations, (7) addressable module, (1) beam detector, (29) smoke detectors
(2) heat detectors, (4) CO detectors, (1) strobe. All work shall be per the 2017 NEC codeCity of Philadelphia · 2023
Provide, install, commission, test, and certify replacement fire alarm system per completed permit drawing set. Work shall consist of the following one for one replacements: (3) FA panels, (1) annunciator, (8) interface modules, (39) horn/strobes, (9) FA pull stations, (2) isolation modules, (3) relay modules, (7) smoke detectors, (2) heat detectors, (10) duct detectors. All installations shall be per the 2017 NEC and 2016 NFPA 72.City of Philadelphia · 2023
New 300A, 240V single phase service installation. Meter cabinet for 5 new meters (Community Center, House, Unit 1, Unit 2 Unit 3). New electrical power, lighting, and fire alarm installation .
-Clouded : community rm floor receptacles ,and washer gfci to be readily assessible. ALL WORK IS TO BE INSTALLED ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.City of Philadelphia · 2023
Permitted projects on public record. Addresses are omitted for privacy.