COMPLETE DEMOLITION OF A WAREHOUSECity of Philadelphia · 2016
AMENDING NEW CONSTRUCTION PERMIT # 594698 FOR THE CHANGE IN STAIR CONFIGURATION AS PER PLANS AND ATTACHED REVIEW DOCUMENT.City of Philadelphia · 2016
FOR THE COMPLETE DEMOLITION OF ONE ATTACHED ONE STORY STRUCTURE FOR USE AS A VACANT RETAIL SPACE. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH CODE BULLETIN B-1302R. EXISTING FENCE TO BE IN PLACE ON PROPERTY AS REFERENCED IN APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2015
FOR THE COMPLETE DEMOLITION OF AN EXISTING SEMI-DETACHED ONE (1) STORY COMMERCIAL BUILDING BY HAND METHODS ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH CODE BULLETIN B-1302. PARTIAL SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2015
*ASBESTOS REMEDIATION REQUIRED PRIOR TO DEMOLITION* FOR THE COMPLETE DEMOLITION OF TWO (2) - ONE (1) STORY EXISTING MASONRY STRUCTURES ON THE LOT. ALL WORK TO BE DONE BY HAND AND IN A HORIZONTAL MANNER. ALL WORK TO BE DON'T UNDER THE SUPERVISION OF A PROFESSIONAL ENGINEER PER SUBMITTED SAFETY PLAN. PROTECTION OF PEDESTRIANS TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE PERMITS REQUIRED FOR SIDEWALK CLOSURE.City of Philadelphia · 2015
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
COMPLETE DEMOLITION OF EXISTING DETACHED STRUCTURE, SITE CLEARING, PAVEMENT REMOVAL AS PER ENGINEERS PLANS AND SAFETY PLAN AND DEPARTMENT DEMO BULLETIN & PROCEDURES. HAND AND MACHINE METHODS AS PRESCRIBED, ENGINEER TO PROVIDE INSPECTION. INSTALLATION OF LOT FENCING AND PEDESTRIAN FENCING AS PER PLANS AND APPROVAL REQUIRED BY STREETS DEPARTMENT FOR SIDEWALK CLOSURE. MUST KEEP SITE SAFE AND CLEAN OF DEBRIS.City of Philadelphia · 2015
FOR THE COMPLETE DEMOLITION OF THE EXISTING STRUCTURE(S). MASONRY WALL AT REAR/SIDE OF THE PROPERTY TO BE PARTIALLY DEMOLISHED TO CREATE FENCE/WALL. FOR USE AS A VACANT LOT.City of Philadelphia · 2015
FOR THE COMPLETE DEMOLITION OF ALL EXISTING SEMI-DETACHED STRUCTURES ON THE LOT. MASONRY WALL AT REAR/SIDE OF THE PROPERTY TO BE PARTIALLY DEMOLISHED TO CREATE FENCE/WALL. DEMOLITION IN ACCORDANCE WITH DEPARTMENT CODE BULLETIN B-1302. ALL WORK TO BE DONE BY HAND AND IN A HORIZONTAL MANNER. PROTECTION OF PEDESTRIANS TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE PERMITS REQUIRED FOR SIDEWALK CLOSURE. NEWLY EXPOSED EXTERIOR WALL TO BE TREATED. SHORING OF TUNNEL ALLEY TO BE DONE PER ENGINEERS REPORT AND DETAIL PROVIDED BY GEORGES R. BALLOUZ, PE.City of Philadelphia · 2015
FOR THE COMPLETE DEMOLITION OF AN EXISTING ONE (1) STORY STRUCTURE. ALL CONSTRUCTION MUST BE IN COMPLIANCE WITH CODE BULLETIN NO. B-1302. ADJACENT STRUCTURES TO BE PROTECTED AS NOTED IN SITE SAFETY PLAN. SAFETY PLAN MUST BE ON SITE AT ALL TIMES.City of Philadelphia · 2015
COMPLETE DEMOCity of Philadelphia · 2015
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO (2) STORY STRUCTURE ON THE LOT. DEMOLITION IN ACCORDANCE WITH DEPARTMENT CODE BULLETIN B-1302. ALL WORK TO BE DONE BY HAND AND IN A HORIZONTAL MANNER. PROTECTION OF PEDESTRIANS TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE PERMITS REQUIRED FOR SIDEWALK CLOSURE AND LATERAL SHUTOFF. NEWLY EXPOSED EXTERIOR WALL TO BE TREATED.City of Philadelphia · 2015
DEMOLITION OF 2 STORY PORTION BUILDING TO CORRECT UNSAFE BUILDING CONDITION AS PER ENGINEERS PLAN AND ENGINEERS SITE SAFETY REPORT.
HAND METHODS ONLY. MUST ENSURE PROPER SAFETY OF SITE AND ADJACENT BUILDINGS AND PEDSTRIANS AS PER ENGINEER PLANS, REPORT AND DEPARTMENT CODE BULLETIN. PRIOR TO ANY WORK STARTING SITE MUST BE PROTECTED/ FENCING INSTALLED REQUIRES ADDITIONAL STREETS DEPARTMENT APPROVAL ON CUTHBERT AND ARCH SIDES.
PLUMBER MUST SEAL OFF LATERAL AND OBTAIN PROPER PERMIT PRIOR TO ANY WORK.City of Philadelphia · 2015
Permitted projects on public record. Addresses are omitted for privacy.