What the public permit record shows, not self-reported reviews.
Is R&A ELECTRIC LLC a real contractor?
R&A ELECTRIC LLC appears in public building-permit records with 14 permits filed through 2023 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is R&A ELECTRIC LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to R&A ELECTRIC LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is R&A ELECTRIC LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. R&A ELECTRIC LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is R&A ELECTRIC LLC's work?
The most recent permit on record for R&A ELECTRIC LLC is dated 2023-05-03, with 14 permits on file in total.
Renovations to existing office. Install lighting, receptacles, exit/emergency lights, (1) 15KVA transformer, (1) 60 amp MCB panel, and telecommunication wiring as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.
Amendment: Removal of electrical equipment due to equipment availability.City of Philadelphia · 2023
THE 400 AMP 120/240V 2 PHASE 5 WIRE SERVICE IS EXISTING. INSTALL A 400 AMP PANEL DPL-C & FEEDER, (1) 200 AMP PANEL & FEEDER, (1) 125 AMP PANEL & FEEDER, (1) 100 AMP PANEL & FEEDER, (1) 200 AMP PHASE CHANGER & FEEDER. INSTALL LIGHTS NORMAL AND EMERGENCY, SWITCHES, SENSORS AND RECEPTACLES. RELOCATE THE EXISTING CIRCUIT IN THE REPLACEMENT PANELS. PROVIDE POWER FOR THE MECHANICAL AND HVAC EQUIPMENT. INSTALL A NEW FIRE ALARM SYSTEM. ALL WORK IN ACCORDANCE WITH THE 2017 NEC & 2016 NFPA-72.City of Philadelphia · 2022
Installation of new 1200 amp electrical service. Refeed existing electrical panels. Installation of new panels, receptacles, lights for new office space as per 2017 NEC.City of Philadelphia · 2022
Installation of receptacles, lights, controls, as PER APPROVED DRAWINGS-2017 NEC.
**NO FIRE ALARM ON THIS PERMIT**City of Philadelphia · 2021
Install new fire alarm wire and fire alarm devices and terminate in existing fire alarm panel as per APPROVED DRAWINGS-2107 NEC ,2018 PHILA FIRE CODE.City of Philadelphia · 2021
Install a new fire alarm system throughout the first and second floors. as per the 2017 nec & 2016 NFPA 72.City of Philadelphia · 2021
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you R&A ELECTRIC LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to R&A ELECTRIC LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Rough-In Permit for EP-2021-009632 Installation of receptacles, lights, controls, and fire alarm as per 2017 nec and nfpa 72City of Philadelphia · 2021
Installation of new lights, switches, fire alarm in restrooms from the 1st through the 5th floors as per 2017 NEC and 2016 NFPA 72.City of Philadelphia · 2021
Install wiring and devices for fire alarm system as per NFPA 72City of Philadelphia · 2021
We will be repairing the damage done to the voice & data cabling due to the recent riots. Upon determination of total damage done additional scope may be needed as per 2017 nec.
We are relocating existing data drops in the Electronics Area, Pharmacy Area, and Fitting Rooms.
We are not doing the electrical portion of the project AS PER NEC 2017City of Philadelphia · 2021
Install 45kva transformer, 150 amp panel, lighting, receptacles, HVAC equipment, and fire alarm system as per the 2017 nnec and 2016 nfpa-72.City of Philadelphia · 2020
Install 3 new electrical panels, new branch circuit wiring for power and lighting. Install new LV wiring for sound masking speakers as per 2017 NEC. Fire alarm & data by others.City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.