What the public permit record shows, not self-reported reviews.
Is QUINN BLACKWELL a real contractor?
QUINN BLACKWELL appears in public building-permit records with 17 permits filed through 2023 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is QUINN BLACKWELL's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to QUINN BLACKWELL by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is QUINN BLACKWELL licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. QUINN BLACKWELL has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is QUINN BLACKWELL's work?
The most recent permit on record for QUINN BLACKWELL is dated 2023-12-13, with 17 permits on file in total.
Child Care - Child Care CenterCity of Philadelphia · 2023
FOR THE TEMPORARY ERECTION OF TENTS FOR CIRCUS EVENTS FROM JUNE 15, 2023 TO JUNE 25, 2023. TEMPORARY STRUCTURES TO COMPLY WITH THE 2018 PHILADELPHIA FIRE CODE AND PROPERTY MAINTENANCE CODE. REQUIRED CLEARENCES MUST BE MAINTAINED FOR EMERGENCY VEHICLE ACCESS TO THE MALL PER 2018 PHILADELPHIA FIRE CODE. SEPERATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND/OR PLUMBING.City of Philadelphia · 2023
INSTALLATION OF NEW HVAC SYTEM FOR RETAIL SPACE IN SUITE 103 ON THE FIRST FLOOR OF AN EXISTING BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW*City of Philadelphia · 2023
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSIONCity of Philadelphia · 2023
FOR EXTERIOR ALTERATIONS (ACCESSIBLE ENTRANCE INCLUDING INSTALLATION OF NEW EXTERIOR RAMP) AND LEVEL II INTERIOR ALTERATIONS WITH A PARTIAL CHANGE IN OCCUPANCY TO GROUP M (RETAIL SALES OF BUILDING SUPPLIES & EQUIPMENT) IN SUITE #103 AT THE 1ST FLOOR. EXISTING BUILDING IS SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDNCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.City of Philadelphia · 2023
FOR CHANGE OF OCCUPANCY AND LEVEL II ALTERATIONS TO INCLUDE PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
AMENDMENT 3/31/23 TO CHANGE LOCATION OF BATHROOM.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you QUINN BLACKWELL?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2023
Personal ServicesCity of Philadelphia · 2022
FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.City of Philadelphia · 2022
FOR LEVEL II INTERIOR ALTERATION (NO CHANGE IN OCCUPANCY) TO AN EXISTING STRUCTURE. WORK TO BE LIMITED TO THE 8TH FLOOR LEVEL OF THE STRUCTURE. FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2022
FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE AS PER APPROVED PLANS. FOR USE AS THREE (3) DWELLING UNITS AND VACANT COMMERCIAL SPACE (SEPARATE C/O REQUIRED FOR COMMERCIAL SPACE). STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 & 13R MINIMUM. **SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.** **2018 IBC**City of Philadelphia · 2021
FOR INTERIOR LEVEL 2 ALTERATIONS TO THE EXISTING RESTUARANT SAPCE AS PER PLANS.
AMENDMENT (7/26/2021) Amendment to include (2) new openings in existing brick party wall. New openings will be infilled with a 1 hour rated partition. and for additional exterior cladding details as per plans.
AMENDMENT (9/24/2021) For a new wall infill added at removed, redundant, exterior door.City of Philadelphia · 2021
For the construction of an addition (Connecting tunnel) connecting two (2) detached structures to create one (1) one structure. Separate permit required for MEP and fire suppression work.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.