What the public permit record shows, not self-reported reviews.
Is QUALITY BUILDERS a real contractor?
QUALITY BUILDERS appears in public building-permit records with 18 permits filed through 2019 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is QUALITY BUILDERS's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to QUALITY BUILDERS by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is QUALITY BUILDERS licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. QUALITY BUILDERS has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is QUALITY BUILDERS's work?
The most recent permit on record for QUALITY BUILDERS is dated 2019-06-20, with 18 permits on file in total.
CONSTRUCTION OF A 2ND STORY REAR ADDITION TO THE EXISTING ONE-STORY PORTION AND THIRD FLOOR ADDITION TO AN EXISTING ATTACHED BUILDING WITH ROOF DECK ON TOP OF THE 3RD STORY ACCESSED BY A PILOTHOUSE. SIZE AND LOCATION AS SHOWN ON THE PLAN.City of Philadelphia · 2019
INTERIOR RENOVATIONS AND MODIFICATION OF STAIR OPENINGS, SIZE AND LOCATION AS PER APPROVED PLANS.City of Philadelphia · 2019
INTERIOR DEMO OF NON LOAD BEARING WALLS ONLY NO STRUCTUAL WORK ON THIS PERMIT..BOTH FLOORS AND BASEMENT AREACity of Philadelphia · 2018
STAIRWELL OPENINGS BASEMENT TO 1ST AND 1ST TO 2ND FLR(STRUCTURAL) INTERIOR RENOVATIONS TROUUGHOUT (NON STRUCTURAL)City of Philadelphia · 2018
EZ PERMIT STANDARDS ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2018
INTERIOR DEMO OF NON-LOAD BEARING WALLS ONLY,NO STRUCTURAL WORK ON THIS PERMITCity of Philadelphia · 2018
REHAB INTERIOR OF SFD AS PER SUBMITTED PLANS.City of Philadelphia · 2018
REHAB INTERIOR WORK SHEETROCK WALLS,UPGRADE BATHROOM AND KITCHEN,WINDOWS AND DOORS INTO EXISTING OPENING.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you QUALITY BUILDERS?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to QUALITY BUILDERS's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2018
INTERIOR DEMO OF NON-LOAD BEARING WALLS ONLY,NO STRUCTURAL WORK ON THIS PERMITCity of Philadelphia · 2017
CONSTRUCT 3RD FLOOR ADDITION OVER EXISTING 2ND FLOOR REARCity of Philadelphia · 2017
INTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF DRYWALL THROUGHOUT. APPLICANT AGREES TO LIMIT THE CONSTRUCTION TO COMPLY WITH EZ PERMIT STANDARD FOR INTERIOR ALTERATIONS, DATED JANUARY 2011. DEVIATION FROM THE STANDARD WILL RESULT IN REVOCATION OF THIS PERMIT AND IMPOSITION OF FURTHER PENALTIES.City of Philadelphia · 2016
INTERIOR DEMOLITION NON-LOAD BEARING PARTITIONS ONLY(SFD)City of Philadelphia · 2016
Permitted projects on public record. Addresses are omitted for privacy.