FOR CONCRETE REPAIRS AS PER APPROVED PLANS.City of Philadelphia · 2026
FOR LEVEL I ALTERATIONS (STRUCTURAL REPAIRS AND MAINTENANCE REPAIRS TO JOINT SEALS AND WATERPROOFING) TO AN EXISTING GROUP S-2 PARKING GARAGE AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
MAKE SAFE PERMIT TO COMPLY WITH CF-2021-059786 FOR REPAIRS/REPLACEMENT OF CONCRETE, STEEL FRAMING, DRAIN EXPANSION JOINT,
SEALANT REPLACEMENT AND INSTALLATION OF TRAFFIC BEARING MEMBRANE TO INCLUDE SHORING OF COLUMNS. AS PER APPROVED PLANS AND IN ACCORDANCE WITH CODE BULLETIN PM-1801. LICENSED PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION. SEPARATE PERMITS REQUIRED FOR ADDITIONAL ALTERATIONS NOT ADDRESSED IN APPROVED PLANS.City of Philadelphia · 2025
FOR EXTERIOR WORK.**ALL WORK TO BE DONE PER APPROVED PLANS .** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018****City of Philadelphia · 2025
FOR EXTERIOR FACADE REPAIRS TO INCLUDE REPOINTING, REPLACEMENT OF ELEMENTS IN KIND, MASONRY/BRICK REPLACEMENT, ROOFING AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY OTHER WORK.City of Philadelphia · 2025
EXTERIOR ALTERATION FOR THE FACADE REPAIR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
AMENDMENT APPROVED AS OF 9/20/2024: AMEND ORINGAL PERMIT WITH CORRECTION OF PLAN AND REMOVAL OF PROPOSED SPECIAL INSPECTION .
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
CONCRETE DECK REPAIRS TO GARAGE LEVEL C AND D AS PER APPROVED PLANS.City of Philadelphia · 2024
EXTERIOR ALTERATION FOR THE FACADE REPAIR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2024
FOR EXTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE FACADE REPAIR. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2024
FOR THE EXTERIOR ALTERATIONS / REPAIR TO BUILDING FACADE. FOR USE AS PREVIOUSLY APPROVED. AS SHOWN ON THE APPROVED PLAN.
IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
**************SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. ********************************
AMENDMENT: FOR THE REMOVAL OF SPECIAL INSPECTIONS WHICH ARE NO LONGER REQUIRED AS PER ATTACHED MEMO.City of Philadelphia · 2024
FOR EXTERIOR REPAIRS AND RENOVATIONS PER APPROVED PLANS.City of Philadelphia · 2024
FOR REPAIRS/RESTORATION OF EXTERIOR WALLS PER APPROVED PLANS. ** EXTERIOR WORK ONLY**City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.