What the public permit record shows, not self-reported reviews.
Is PMC MECHANICAL CONTRACTORS INC a real contractor?
PMC MECHANICAL CONTRACTORS INC appears in public building-permit records with 129 permits filed through 2017 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is PMC MECHANICAL CONTRACTORS INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to PMC MECHANICAL CONTRACTORS INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is PMC MECHANICAL CONTRACTORS INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. PMC MECHANICAL CONTRACTORS INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is PMC MECHANICAL CONTRACTORS INC's work?
The most recent permit on record for PMC MECHANICAL CONTRACTORS INC is dated 2017-08-21, with 129 permits on file in total.
REPLACE SOIL AND WASTE LINES ALONG WITH BATHROOM TOILET,SINK AND TUB/SHOWER FIXTURES.THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004City of Philadelphia · 2017
INTERIOR PLUMBING ALTERATIONS ON THE 6TH FLOOR CREATIVE THERAPY CENTER & ROOF AT MAGEE MEMORIAL HOSPITAL - WATER SUPPLIES TO EQUIPMENT AND/OR HOSE CONNECTIONS MUST BE PROTECTED PER SECTION P-806.1.1 OF THE PHILADELPHIA PLUMBING CODE 2004 UTILIZING A METHOD OF PROTECTION FROM TABLE 608.1 OF THE 2009 INTERNATIONAL PLUMBING CODE - THE INSTALLATION WILL COMPLY WITH THE APPROVED PLANS AND THE PHILADELPHIA PLUMBING CODE 2004City of Philadelphia · 2016
REPLACEMENT ONLY NO ADD'L PIPING 20-FIXTURES INCLUDING WATER CLOSETS, URINALS & LAVATORIES THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004City of Philadelphia · 2016
PLUMBING ALTERATIONS ON THE 21ST AND 22ND FLOORS - EDISON BUILDING - THOMAS JEFFERSON UNIVERSITY PER THE APPROVED PLANS AND THE PHILADELPHIA PLUMBING CODE 2004 - PLEASE NOTE: ITEMS IDENTIFIED ON THE FIXTURE SCHEDULE AS SK-1 & SK-2 HAVE 1-1/2" FIXTURE WASTE OUTLETS NOT 1/2" AS IDENTIFIED ON THE PLANSCity of Philadelphia · 2016
RENOVATE EXISTING BATHROOMS NO CHANGE IN FIXTURE COUNTS OR ADDED LOAD TO PRANGLE SYSTEM.INCLUDED WATER CLOSETS, LAVS, SHOWERS AND SINKS (HEALTH CARE)*SCOPE OF WORK IS CONTINUED FROM PERMIT 564880*City of Philadelphia · 2016
INTERIOR PLUMBING ALTERATIONS IN SPACE "A" FOR A TAKE-OUT RESTAURANT (BEEFSTEAK) - THE GREASE TRAP REQUIREMENT HAS BEEN AIVED BY THE DEPARTMENT - FIXTURES/EQUIPMENT PIPING MUST COMPLY WITH TABLE(S) P-811.2 & P-904.7 OF THE PHILADELPHIA PLUMBING CODE 2004 - WATER SUPPLY TO FIXTURES MUST BE PROTECTED AGAINST BACKFLOW BY AN ISOLATION METHOD LISTED IN TABLE 608.1 OF THE 2009 INTERNATIONAL PLUMBING CODE - ITEM #2 MOP SINK REQUIRES A 3" DIRECT CONNECTION TO THE SANITARY TO COMPLY WITH TABLE P-904.7, ITEM #8 WALK-IN COOLER REQUIRES AN 1-1/4" TRAPPED INDIRECT WASTE PER TABLE P-904.7, ITEM #16 THE (3)COMPARTMENT SINK REQUIRES A MINIMUM 2" DIRECT CONNECTION PER TABLE P-904.7 AND 3/4" HOT & COLD FIXTURE WATER SUPPLIES PER TABLE P-811.2, ITEM #62 ICE MACHING REQUIRES AN 1-1/4" TRAPPED INDIRECT WASTE PER TABLE P-904.7 OF THE PHILADELHIA PLUMBING CODE 2004 - THE INSTALLATION WILL COMPLY WITH THE APPROVED PLANS
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you PMC MECHANICAL CONTRACTORS INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to PMC MECHANICAL CONTRACTORS INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2016
ALTERATION: INTERIOR PLUMBING FOR A DIALYSIS CENTER ON THE 1ST FLOOR OF A 3-STORY BUILDING. THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004.City of Philadelphia · 2016
FOR THE INSTALLATION OF NEW REGISTERS, DIFFUSERS AND ALL SUPPLEMENTAL DUCTWORK TO TIE INTO AN EXISTING HVAC SYSTEM IN AN EXISTING EDUCATIONAL FACILITY.City of Philadelphia · 2016
INSTALL PIPING FROM EXISTING FOR, 2-SINKS, 1 FLOOR DRAIN & 1 WATER SERVICE - THE INSTALLATION WILL COMPY WITH THE PHILADEPHIA PLUBMING CODE 2004City of Philadelphia · 2015
INSTALL PIPING & FIXTURES INCLUDING LAVS, URINALS SINK MOP SINK, EWC & WASHER BOX THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004City of Philadelphia · 2015
REMOVE TOILET, LAV AND ASSOCIATE PIPING, REPLACE WITH NEW.City of Philadelphia · 2015
CONNECT TO EXISTING SERVICES TO INSTALL 1- NEW SINKCity of Philadelphia · 2015
Permitted projects on public record. Addresses are omitted for privacy.