What the public permit record shows, not self-reported reviews.
Is Pinemar, Inc a real contractor?
Pinemar, Inc appears in public building-permit records with 14 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Pinemar, Inc's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Pinemar, Inc by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Pinemar, Inc licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Pinemar, Inc has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Pinemar, Inc's work?
The most recent permit on record for Pinemar, Inc is dated 2026-05-04, with 14 permits on file in total.
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO BATHROOMS WITHIN AN EXISTING MULTI-FAMILY DWELLING TO INCLUDE JOIST SISTERING AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**City of Philadelphia · 2026
FOR SITEWORK AND ONSITE UTILITY FOR THE EXISTING COURTYARD PATIO, REPLACING THE STORM WATER DRAINAGE PIPES BELOW THE PATIO, PITCHED FOR PROPER DRAINAGE FROM THE AREA/YARD AND STORM DRAINS TO THE STREAM ON THE PROPERTY. ALL WORK PER APPROVED PLANS.
IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
FOR ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING AS PER BUILDING APPLICATION/PLAN AND PHC APPROVAL.
**AMENDMENT**
SP-2025-000627 AMENDED TO INCLUDE UNDERPINNING, SPECIAL INSPECTIONS AND ASSOCIATED DOCUMENTATION.City of Philadelphia · 2025
ADDITION AND INTERIOR ALTERATIONS THROUGHOUT AS PER PLANS. NO EXCAVATION PROPOSED EXCEEDDING FIVE FOOT IN DEPTH AND NO IMPACTS TO ADJACENT PROPERTIES. NO UNDERPINNING IN THIS PERMIT.City of Philadelphia · 2025
FOR LEVEL 2 ALTERATIONS TO EXISTING STRUCTURE FOR CHANGES TO LAYOUT OF AN EXISTING DWELLING UNITS AS PER PLANS.City of Philadelphia · 2023
RENOVATIONS TO INCLUDE THE ERECTION OF A REAR ADDITION WITH ROOF DECK. NO CHANGES BASEMENT SLAB.City of Philadelphia · 2022
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Pinemar, Inc?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Exterior façade and roof repairs per Philadelphia Historic Commission approvals. All work is non-structural.City of Philadelphia · 2022
FOR LEVEL I ALTERATIONS TO AN EXISTING DWELLING UNIT ON THE SEVENTH FLOOR LEVEL, ALTERATIONS TO INCLUDE THE INSTALLATION OF FINISHES AND FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2022
ADD ROOF TOP DECK WITH STAIR--EXTEND EXISTING ELEVATOR TO ROOF DECK WITH PILOT HOUSE--SEE ATTACHED PHC REQUIREMENT--NO WORK TO FRONT FACADECity of Philadelphia · 2020
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO AN EXISTING APPARTMENT (UNIT 6A) PART OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS AND PHC APPROVAL.**IEBC 2018**SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL,ELECTRICAL AND PLUMBING WORK**City of Philadelphia · 2020
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING UNIT 5A WITHIN AN EXISTING HIGH-RISE CONDO BUILDING AS PER APPROVED PLANS. *2018*
**SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**City of Philadelphia · 2020
REMOVING ABOUT 400SQ FT OF OLD CONRETE SLAB IN BASEMENT. POUR NEW CONCRETE TO REPLACE. WE ARE NOT CHANGING LEVEL.City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.