What the public permit record shows, not self-reported reviews.
Is Pill Bug Construction LLC a real contractor?
Pill Bug Construction LLC appears in public building-permit records with 11 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Pill Bug Construction LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Pill Bug Construction LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Pill Bug Construction LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Pill Bug Construction LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Pill Bug Construction LLC's work?
The most recent permit on record for Pill Bug Construction LLC is dated 2026-01-07, with 11 permits on file in total.
- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; INCLUDING UNDERPINNING, EXCAVATION, AND REMOVAL OF FOUNDATION SLAB.
***NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR.*** Separate permits required for Mechanical, Electrical, and Plumbing workCity of Philadelphia · 2026
For alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations, underpinning and excavations (i.e., digging in basement). Any work/alterations to the basement/cellar are expressly prohibited unless documented as an existing habitable space with heights and means of egress per conditions of the EZ standard. separate permits required for mechanical, electric and plumbing, etc.
*No basement alterations of any kind were proposed or approved for this permit*
*No structural alterations of any kind were proposed or approved for this permit*City of Philadelphia · 2025
Alterations of existing tenant space in an Open Market (Reading Terminal Market) as per approved plans. Separate permits required for MEP work.City of Philadelphia · 2024
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
96% 60,000 BTU GAS FURNACE, 2.5 TON AC ON THE GROUND IN THE BACK OF THE HOUSE, 2.5 TON COIL, DUCTWORK, & (8) DIFFUSERS
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Pill Bug Construction LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Pill Bug Construction LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2023
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
96% 60k BTU GAS FURNACE, 2 TON AC ON THE GROUND IN THE BACK OF THE HOUSE, 2 TON COIL, DUCTWORK, & (9) DIFFUSERSCity of Philadelphia · 2023
*CONTRACTOR HAS A NOTORIZED LETTER WITH NO EMPLOYEES, SOLE WORKER*MUST UPLOAD SUB-CONTRACTOR INFORMATION IF APPLICABLE*
EZ PERMIT STANDARDS ALTERATIONS
For alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations, underpinning and excavations (i.e., digging in basement). Any work/alterations to the basement/cellar are expressly prohibited unless documented as an existing habitable space with heights and means of egress per conditions of the EZ standard. separate permits required for mechanical, electric and plumbing, etc.
*No basement alterations of any kind were proposed or approved for this permit*
*No structural alterations of any kind were proposed or approved for this permit*
APPROVED SCOPE OF WORK
THE APPROVED ALTERATIONS FOR THIS PERMIT ARE LIMITED TO NON-STRUCTURAL ALTERATIONS THROUGHOUT THE FIRST AND SECOND FLOOR PER SUBMITTED ENGINEER LETTER.City of Philadelphia · 2023
INTERIOR ALTERATIONS THROUGHOUT A TWO-STORY SINGLE-FAMILY DWELLING. NO INCREASE OR SIZE OR HEIGHT TO TWO STORY STRUCTURE. SHORING FOR WALL REPLACEMENT AS PER PLAN. JOISTS AND STAIRS REPLACEMENT PER PLANS. NO DIGGING OR EXCAVATIONS IN THE BASEMENT WITH EXISTING 7 FT FINISHED CEILING HEIGHT. NOT TO REPLACE MORE THAN 2/3RDS OF THE FLOOR JOIST. NO UNDERPINNING OR EXCAVATION AS PART OF THIS PERMIT. NOTICE TO ADJACENT PROPERTIES 10 DAYS PRIOR TO THE START OF WORK. UTILITIES ONLY IN THE BASEMENT. NO BEDROOMSCity of Philadelphia · 2023
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
96% 60k BTU GAS FURNACE, 2.5 TON AC ON THE GROUND IN THE BACK OF THE HOUSE, 2.5 TON COIL, DUCTWORK, & (8) DIFFUSERSCity of Philadelphia · 2023
INTERIOR ALTERATIONS THROUGHOUT A TWO STORY SINGLE FAMILY DWELLING. NEW WINDOW WELL IN THE BASEMENT. NEW SIDE AND REAR AT THE SECOND FLOOR REAR BUMP OUT. NO INCREASE OR SIZE OR HEIGHT TO TWO STORY STRUCTURE. SHORING FOR WALL REPLACEMENT AS PER PLAN. NO INTERIOR LAYOUT TO THE FRAMING AND WALL COVERING ONLY. NO DIGGING OR EXCAVATIONS IN THE BASEMENT WITH EXISTING 7 FT FINISHED CEILING HEIGHT.City of Philadelphia · 2023
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES
For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
96% 60,000 BTU GAS FURNACE, 2.5 TON AC ON THE GROUND IN THE BACK OF THE HOUSE, 2.5 TON COIL, DUCTWORK, & (8) DIFFUSERSCity of Philadelphia · 2022
EZ PERMIT STANDARDS ALTERATIONS
For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS, UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT). ANY WORK/ALTERATIONS TO THE BASEMENT/CELLAR IS EXPRESSLY PROHIBITED UNLESS DOCUMENTED AS AN EXISTING HABITABLE SPACE WITH HEIGHTS AND MEANS OF EGRESS PER CONDITIONS OF THE EZ STANDARD. Separate permits required for Mechanical, Electric and Plumbing, ETC.
Interior renovations to include: 1) Strip or replace the partitions, interior walls, and ceilings. 2) Install GWB to all partitions, interior walls, and ceilings 3) Place new hardwood floorings. 4) Replace the windows, interior, and exterior doors in existing openings. 5) Install new kitchen with cabinets, countertop, and flooring. 6) Install a full bathroom on second floor with floor and walls covered with tiles. 7) Insulate the ceilings with R-38 and the roof with R-49 8) Apply cosmetics and paint job. Separate permits required for mechanical, electric, & plumbing work.City of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.