What the public permit record shows, not self-reported reviews.
Is Philly Dwell LLC a real contractor?
Philly Dwell LLC appears in public building-permit records with 31 permits filed through 2023 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Philly Dwell LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Philly Dwell LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Philly Dwell LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Philly Dwell LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Philly Dwell LLC's work?
The most recent permit on record for Philly Dwell LLC is dated 2023-06-12, with 31 permits on file in total.
FOR THE INSTALLATION OF A NEW MECHANICAL SYSTEM INCLUDING NEW MECHANICAL APPLIANCES, REGISTERS AND DIFFUSERS WITH ASSOCIATED DUCT WORK AS PER PLANS. **AMENDED AS OF 7/16/2025 AS PER PLANS**City of Philadelphia · 2023
INTERIOR RENOVATIONS **AMENDED PLAN TO INCLUDED INTERIOR RE-CONFIGURATIONS**
**AMENDMENT 9/18/24**
This amendment is for the proposed minor interior updates listed below
1st floor:
• Closet updated to laundry closet
• Kitchen layout included
2nd floor:
• Bedroom and Bathrooms reconfigurations, elevator specs updated
• Closets addition
3rd floor:
• Bathroom tubs replaced by showers
• Closet addition
• Bedroom reconfiguration
No structural or exterior changes.City of Philadelphia · 2023
FOR INTERIOR ALTERATION OF EXISTING STRUCTURE TO CONTINUES USE AS HOUSEHOLD LIVING SINGLE FAMILY DWELLING. SIZE AND LOCATION AS PER PLAN. * SEPARATE PERMITS REQUIRED FOR PLUMBING, ELECTRIC AND MECHANICAL. *
** ALL WORK SHALL BE DONE IN ACCORDANCE WITH PHILADELPHIA HISTORICAL COMMISSION'S GUIDELINES AND APPROVED PLAN **City of Philadelphia · 2023
FOR THE MODIFICATION OF EXISTING HVAC SYSTEMS, ASSOCIATED DUCT WORK, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSIONCity of Philadelphia · 2022
FOR LEVEL 2 ALTERATIONS AND FOR THE ADDITION OF A RAMP FOR PARKING AT THE BASEMENT LEVEL AS PER PLANS.
AMENDMENT (11/14/2022) TO REVISE GYM AND ADD PET WASHING STATION AS PER RVISED PLANS.City of Philadelphia · 2022
For the installation of mechanical work to include registers/diffusers, supply/exhaust ductwork, appliances, and all other work as per approved plans.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Philly Dwell LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Philly Dwell LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2021
FOR LEVEL II INTERIOR ALTERATIONS IN THE BASEMENT. **AMENDMENT FOR REVISED FLOOR PLAN IN BASEMENT**City of Philadelphia · 2021
FOR THE ERECTION OF A NEW CONSTRUCTION USED AS MULTI-FAMILY HOUSEHOLD LIVING (26 DWELLING UNITS) WITH ACCESSORY PARKING SPACES. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR M.E.P.S WORK. SEPARATE APPROVAL REQUIRED FROM PA L&I FOR ELEVATOR INSTALLATION.City of Philadelphia · 2021
For an extension of the elevator to the 12th floor only as per plans. No work to the exterior, no work to the facade and no windows to be changed. This application proposes no signs. Without prejudice to, or abandonment of, all prior permits and approvalsCity of Philadelphia · 2021
Asbestos abatement required prior to commencement of work.City of Philadelphia · 2021
FOR LEVEL 2 ALTERATIONS FOR NEW WHOLES THROUGH FLOOR AS PER PLANS.City of Philadelphia · 2020
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO A PORTION OF THE 1ST FLOOR OF AN EXISTING HIGH-RISE BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT THE DESIGNATED FLOOR. **ALL WORK TO BE DONE PER APPROVED PLANS**. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**EXISTING BUILDING FULLY SPRINKLERED**IEBC 2018** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**NO EXTERIOR WORK APPROVED ON THIS PERMIT**NO SIGN APPROVED ON THIS PERMIT**
AMENDMENT APPROVED ON 11/15/2021: TO REFLECT LAYOUT CHANGES TO RELOCATE THE MAILROOM, FIRE COMMAND ROOM AND TO ADD A TOILET ROOM IN LOBBY AREA, AS PER APPROVED PLANS.City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.