What the public permit record shows, not self-reported reviews.
Is PAUL JANAITIS a real contractor?
PAUL JANAITIS appears in public building-permit records with 39 permits filed through 2020 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is PAUL JANAITIS's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to PAUL JANAITIS by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is PAUL JANAITIS licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. PAUL JANAITIS has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is PAUL JANAITIS's work?
The most recent permit on record for PAUL JANAITIS is dated 2020-02-12, with 39 permits on file in total.
FOR THE ERECTION OF A WOOD FRAME THREE STORY ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2009 IRC. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. PROTECTION OF PEDESTRIANS, RIGHT-OF-WAY, AND ADJACENT PROPERTIES REQUIRED AT ALL TIMES.City of Philadelphia · 2020
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
INSTALLATION OF 90% GAS FURNACE WITH THREE(3)TON CONDENSOR IN REAR YARD AND RELATED DUCTWORK.City of Philadelphia · 2020
FOR LEVEL I ALTERATION WITH NO CHANGE IN OCCUPANCY TO INCLUDE RECONSTRUCTION OF FRONT WALL PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING.City of Philadelphia · 2020
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
INSTALLATION OF 90% GAS FURNACE WITH THREE(3)TON CONDENSER IN REAR YARD AND RELATED DUCTWORK.City of Philadelphia · 2020
INSTALL 4 1.5 TO HEAT PUMPS.ALL EQUIPMENT AND ASSOCIATED DUCT WORK TO BE CONTAINED ENTIRELY WITHIN TENANT SPACE. NO COMMUNICATING DUCTWORK.
GAS FIRED APPLIANCES NOT TO BE LOCATED IN CEILING SPACE WHERE USED AS A RETURN AIR PLENUM. RETURNS TO BE DUCTED. Installation of mechanical equipment. All equipment and associated duct work is to be installed entirely within the same dwelling unit with no penetrations of fire rated assemblies and installed as per manufactures’ specifications. Installation must meet the code requirements of the International Mechanical Code and the International Energy Conservation Code.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you PAUL JANAITIS?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2020
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2019
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2019
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plansCity of Philadelphia · 2019
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2019
EZ MASONRY FACADE PERMIT STANDARDS-REMOVE AND REPLACE FRONT FACADE WITH KIND ON THE EXISTING FOUNDATION. For Facade Replacement on One-Family Dwellings, 3-Story Maximum HeightCity of Philadelphia · 2019
LIMITED DEMOLITION (BY HAND) OF AN EXISTING 2-STORY MASONRY BUILDING. INTERIOR RENOVATION & PROPOSED 3RD FLOOR ADDITION W/ROOF DECKS ACCESSED BY PILOT HOUSES ON/UPON/ABOVE PROPOSED 3RD FLR-STORY ROOF, ON ONE (1) EXISTING PARCEL. TO BE USED AS (2) DUPLEXES CONTAINING (2) DWELLING UNITS EACH. (PLANS , REVIEW AND DOCUMENTS SUBMITTED WITH A/P #1009668)City of Philadelphia · 2019
LIMITED DEMOLITION (BY HAND) OF AN EXISTING 2-STORY MASONRY BUILDING. INTERIOR RENOVATION & PROPOSED 3RD FLOOR ADDITION W/ROOF DECKS ACCESSED BY PILOT HOUSES ON/UPON/ABOVE PROPOSED 3RD FLR-STORY ROOF, ON ONE (1) EXISTING PARCEL. TO BE USED AS (2) DUPLEXES CONTAINING (2) DWELLING UNITS EACH.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.