What the public permit record shows, not self-reported reviews.
Is ON POINT DEVELOPMENT LLC a real contractor?
ON POINT DEVELOPMENT LLC appears in public building-permit records with 20 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ON POINT DEVELOPMENT LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ON POINT DEVELOPMENT LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ON POINT DEVELOPMENT LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ON POINT DEVELOPMENT LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ON POINT DEVELOPMENT LLC's work?
The most recent permit on record for ON POINT DEVELOPMENT LLC is dated 2025-03-13, with 20 permits on file in total.
FOR STRUCTURAL REPAIRS TO THE REAR AND ALTERATIONS TO AN EXISTING ATTACHED SINGLE-FAMILY DWELLING AS PER APPROVED PLAN.
*SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*
**NO UNDERPINNING ON THIS PERMIT**
AMENDMENT #1
AMEND TO CHANGE STRUCTURAL COMPONENTS INCLUDING THE FOUNDATION AND FIRST FLOOR JOISTS AS PER APPROVED AMENDED PLAN.City of Philadelphia · 2025
ERECTION OF A ONE STORY ADDITION WITH ROOF DECK ACCESSED BY A PILOT HOUSE ABOVE EXISTING SINGLE FAMILY STRUCTURE.
NEW FINISHES, APPLIANCES & CABINETRY THROUGHOUT EXISTING STRUCTURE AS REQUIRED.City of Philadelphia · 2020
Interior renovations and rebuild rear exterior wall. No change to exterior dimensions of structure.City of Philadelphia · 2020
For the addition to- and renovation of an existing single family, two story, masonry dwelling.
Renovation to include construction of non-structural interior walls, stairs, plumbing, electrical, casework, per new work plans.
Addition to include third floor & roof deck accessible via pilot house (to contain stairs and landing only,) per new work plans.City of Philadelphia · 2020
MAKE SAFE PERMIT- FOR (REPAIR ROOF STRUCTURE,(HOLE CUT IN ROOF DECK), AND REROOF) TO RESOLVE CASE #717607. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6' IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #717607.City of Philadelphia · 2020
LEVEL II INTERIOR ALTERATIONS(NO CHANGE IN OCCUPANCY).FOR THE RELOCATION OF 1ST AND 2ND FLOOR STAIR OPENINGS ONLY. IN AN EXISTING STRUCTURE AS PER APPROVED PLANS
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ON POINT DEVELOPMENT LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ON POINT DEVELOPMENT LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2019
Interior Alterations to include drywall, sheet rock, framing, new bathroom, new kitchen, and new windows and doors in existing opening. Applicant agrees to limit the construction to comply with EZ Permit Standard for Interior Alterations, dated January 2011. Deviation from the Standard will result in revocation of this permit and imposition of further penalties. SEPARATE PERMITS REQUIRED FOR PLUMBING, ELECTRICAL AND MECHANICAL WORK. STRUCTURAL WORK NOT ALLOWED ON THIS PERMIT.NOTE: CONTRACTOR IS LISTED AS A "SOLE PROPRIETOR" AND HAS NO EMPLOYEES AND/OR WORKERS COMPENSATION INSURANCE - ALL SUBCONTRACTORS REQUIRE SEPARATE LICENSES AND INSURANCECity of Philadelphia · 2019
EZ EXTERIOR WALL COVERINGS- FOR THE APPLICATION OF EXTERIOR WALL COVERINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2018
CONSTRUCTION OF A REAR DECK AT FIRST FLOOR LEVEL PER SUBMITTED PLANS.City of Philadelphia · 2018
EZ PERMIT DECKS- FOR NEW DECKS ACCESSORY TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2017
EZ PERMIT DECKS- FOR NEW DECKS ACCESSORY TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2017
EZ PERMIT DECKS- FOR NEW DECKS ACCESSORY TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED
STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION
OF CONSTRUCTION PLANS.City of Philadelphia · 2017
Permitted projects on public record. Addresses are omitted for privacy.