What the public permit record shows, not self-reported reviews.
Is OMEGA HOME BUILDERS a real contractor?
OMEGA HOME BUILDERS appears in public building-permit records with 107 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is OMEGA HOME BUILDERS's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to OMEGA HOME BUILDERS by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is OMEGA HOME BUILDERS licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. OMEGA HOME BUILDERS has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is OMEGA HOME BUILDERS's work?
The most recent permit on record for OMEGA HOME BUILDERS is dated 2026-03-24, with 107 permits on file in total.
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT AND THE EXCAVATION PERMIT-SP-2026-000193. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT AND THE EXCAVATION PERMIT-SP-2026-000193. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE (ENCLOSED ACCESS STAIRS ONLY). FOR USE AS A SINGLE-FAMILY DWELLING WITH ONE (1) OFF-STREET ACCESSORY PARKING SPACE. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK (FOR EXCAVATION WORK SEE SP-2026-000193). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTYCity of Philadelphia · 2026
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT AND THE EXCAVATION PERMIT-SP-2026-000193. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you OMEGA HOME BUILDERS?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to OMEGA HOME BUILDERS's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2026
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT AND THE EXCAVATION PERMIT-SP-2026-000193. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE (ENCLOSED ACCESS STAIRS ONLY). FOR USE AS A SINGLE-FAMILY DWELLING WITH ONE (1) OFF-STREET ACCESSORY PARKING SPACE. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK (FOR EXCAVATION WORK SEE SP-2026-000193). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE (ENCLOSED ACCESS STAIRS ONLY). FOR USE AS A SINGLE-FAMILY DWELLING WITH ONE (1) OFF-STREET ACCESSORY PARKING SPACE. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK (FOR EXCAVATION WORK SEE SP-2026-000193). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE (ENCLOSED ACCESS STAIRS ONLY). FOR USE AS A SINGLE-FAMILY DWELLING WITH ONE (1) OFF-STREET ACCESSORY PARKING SPACE. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK (FOR EXCAVATION WORK SEE SP-2026-000193). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE (ENCLOSED ACCESS STAIRS ONLY). FOR USE AS A SINGLE-FAMILY DWELLING WITH ONE (1) OFF-STREET ACCESSORY PARKING SPACE. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK (FOR EXCAVATION WORK SEE SP-2026-000193). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE (ENCLOSED ACCESS STAIRS ONLY). FOR USE AS A SINGLE-FAMILY DWELLING WITH ONE (1) OFF-STREET ACCESSORY PARKING SPACE. BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13D AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK (FOR EXCAVATION WORK SEE SP-2026-000193). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE ERECTION OF A SEMI-DETACHED STRUCTURE WITH A BELOW GRADE PARKING GARAGE AND AN ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH ROOF ACCESS STRUCTURE AS PER APPROVED PLANS. FOR TWO (2) VACANT COMMERCIAL SPACES ON GROUND FLOOR (USE REGISTRATION PERMIT REQUIRED PRIOR TO OCCUPANCY) AND MULTI-FAMILY HOUSEHOLD LIVING (146) DWELLING UNITS AND (54) ACCESSORY OFF STREET INTERIOR BELOW GRADE PARKING SPACES AND (56) OFF STREET BICYCLE (CLASS 1A) PARKING SPACES ON AN ACCESSIBLE ROUTE. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK. HORIZONTAL EXITS ARE PROPOSED FROM 2ND TO 6TH STORIES.City of Philadelphia · 2026
APPLICATION IS FOR A NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE (SIZE AND LOCATION AS SHOWN ON PLANS/APPLICATION)City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.