What the public permit record shows, not self-reported reviews.
Is OMEGA CORPORATION a real contractor?
OMEGA CORPORATION appears in public building-permit records with 43 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is OMEGA CORPORATION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to OMEGA CORPORATION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is OMEGA CORPORATION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. OMEGA CORPORATION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is OMEGA CORPORATION's work?
The most recent permit on record for OMEGA CORPORATION is dated 2026-05-07, with 43 permits on file in total.
Provide electrical lighting under 8 mezzanine. Relocate existing wall outlets. Provide electrical power to disconnect for elevator and direct line to panel.City of Philadelphia · 2026
FOR LEVEL II ALTERATIONS, CONSTRUCTION OF MEZZANINE, AND INSTALLATION OF ACCESSIBLE LIFT. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.City of Philadelphia · 2026
Rewire existing outlets on the first and second floor where walls are currently open.City of Philadelphia · 2025
For temporary shoring and reconstruction of the rear wall and foundation per plans.City of Philadelphia · 2025
Electrical Permit for combo RP-2025-001414City of Philadelphia · 2025
INTERIOR ALTERATION AND NEW TWO-STORY ADDITION IN THE REAR, DETAILS PER PLAN.City of Philadelphia · 2025
We propose to remove knob and tube wiring at above address 475 Shurs Lane Phila 19127 and all Bx wiring with no ground. Outlets in baseboards with no ground will be rewired and raised to 18" above floor level. Lath and plaster will be removed to run standard 12-2 or 14-2 or 14-3 and replaced by others. All work will be inspected by United Inspection Agency and a permit will be obtained by City of Philadelphia. All switching and lighting will be replaced if need be. Outlets where possible while walls are open and easy access will be installed for convenience.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you OMEGA CORPORATION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to OMEGA CORPORATION's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
EZ PERMIT STANDARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; INCLUDING UNDERPINNING, EXCAVATION, AND REMOVAL OF FOUNDATION SLAB.NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR.City of Philadelphia · 2024
Supply power for 80 gallon hot water heater 10-2 w/g and thirty amps two pole breaker
Supply power in m/c 12-2 w/g 20 amp circuit homerun to three gfci outlets counter height along north wall.
Supply power in m/c 12-2 w/g to bathroom gfci outlet and fan and light center of ceiling on separate 20 amp circuit
home run.
Supply power in m/c 12-2 w/g to two gfci outlets counter height along west wall 20 amp circuit home run.
Take circuit from panel that feeds lighting circuit, run switch tail to front of building entrance to control lighting.
Supply switch and overhead sconce above north wall and switch and overhead sconce on west wall on same circuit in
12-2 m/c.
Notes
Need countertop heights before box setting
No fixtures supplied by contractor
Need fixture height for each wall sconce on North and west walls switch height will be 48” Above finish floor.City of Philadelphia · 2024
INSTALL 200 AMP ELECTRICAL SERVICE, METER SOCKET AND CIRCUIT BREAKER PANEL WITH PROPER GROUNDING. RELOCATE SWITCH ACCORDING TO THE 2017 NEC.City of Philadelphia · 2024
Install new 40 circuit 200 amp panel supply power to all HVAC equipment with disconnects.
AS PER NEC 2017City of Philadelphia · 2023
FOR LEVEL II ALTERATIONS TO INCLUDE EXTERIOR RAMP, NEW EQUIPMENT, FURNISHINGS, FLOORS, FINISHES AS PER APPROVED PLANS. SEPARTE PERMITS REQUIRED FOR ANY MEP WORK.City of Philadelphia · 2023
Permitted projects on public record. Addresses are omitted for privacy.