What the public permit record shows, not self-reported reviews.
Is Ok Finish Construction a real contractor?
Ok Finish Construction appears in public building-permit records with 14 permits filed through 2024 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Ok Finish Construction's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Ok Finish Construction by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Ok Finish Construction licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Ok Finish Construction has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Ok Finish Construction's work?
The most recent permit on record for Ok Finish Construction is dated 2024-06-03, with 14 permits on file in total.
basement renovation. replacing garage door with door and windows (zoning permit already issued ZP-2024-003755. new floors, trim work, spackling, painting. adding closet. details per plan. no other work included.City of Philadelphia · 2024
PERMIT STANDARDS ALTERATIONS
For alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations, underpinning and excavations (i.e., digging in basement). Any work/alterations to the basement/cellar are expressly prohibited unless documented as an existing habitable space with heights and means of egress per conditions of the EZ standard. separate permits required for mechanical, electric and plumbing, etc.
*No structural alterations of any kind were proposed or approved for this permit*City of Philadelphia · 2024
FOR THE ERECTION OF A NEW THREE-STORY, ATTACHED STRUCTURE OF TYPE VB CONSTRUCTION AS PER PLANS. FOR R-2 OCCUPANCY (FIVE (5) DWELLING UNITS) WITH LAYOUT AS SHOWN.City of Philadelphia · 2023
MAKE SAFE PERMIT- For (brief description of work as per Engineer?s report if applicable) to resolve case CF-2020-068096. Abutting sidewalk must be closed with fencing a minimum of 6? in height. Separate Streets Department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case CF-2020-068096 . To remove violations in CF_2020-068096 by stuccoing the adjacent wallCity of Philadelphia · 2021
MAKE SAFE PERMIT- Rear portion of the house was rebuilt and structurally sound with material like and kind. Roof framing rafters and sheathing like and kind was replace with a new roof covering. All repair were done per engineer report to comply violations to resolve case 629347. Abutting sidewalk must be closed with fencing a minimum of 6? in height. Separate Streets Department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case 629347.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Ok Finish Construction?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Ok Finish Construction's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2020
FOR THE LEVEL II ALTERATION WITH COMPLETE CHANGE OF OCCUPANCY TO CREATE AN ADULT DAY CARE CENTER AS PER APPROVED PLAN. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPP. WORK. SEPARATE PERMITS REQUIRED FROM PA DEPT OF LABOR & INDUSTRY FOR ELEVATOR INSTALLATION. ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF THE WORK.City of Philadelphia · 2019
FOR THE PLACEMENT OF UNDERPINNING IN THE BASEMENT OF AN EXISTING SINGLE FAMILY DWELLING AS PER PLAN,City of Philadelphia · 2017
EZ PERMIT STANDARD ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2015
EXTERIOR STUCCO ON REAR AND SIDE OF SINGLE FAMILY DWELLING. SMALL REPAIR OF ROOF ABOVE THE WALKWAY BETWEEN HOME.City of Philadelphia · 2015
INTERIOR DEMO OF NON-LOAD BEARING PARTITIONS ONLY. SINGLE FAMILY DWELLINGCity of Philadelphia · 2015
EZ PERMIT STADARD ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2015
REPLACEMENT KITCHEN CABINETS, TOILETS VANITIES, PAITING FLOOR FINISHING INSTALLING NEW DOORS AND MOLDING TILE WORKS NEW WINDOWS AND GUTTERS AND CAPPING INSTALLATION.EZ PERMIT STADARD ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANSCity of Philadelphia · 2015
Permitted projects on public record. Addresses are omitted for privacy.