What the public permit record shows, not self-reported reviews.
Is OCTO STUDIO, INC a real contractor?
OCTO STUDIO, INC appears in public building-permit records with 7 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is OCTO STUDIO, INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to OCTO STUDIO, INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is OCTO STUDIO, INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. OCTO STUDIO, INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is OCTO STUDIO, INC's work?
The most recent permit on record for OCTO STUDIO, INC is dated 2025-10-09, with 7 permits on file in total.
Mechanical / Fuel Gas Permit for combo RP-2024-010097City of Philadelphia · 2025
FOR THE ERECTION OF A NEW 3-STORY ATTACHED STRUCTURE WITH (1) ACCESSORY GARAGE PARKING SPACE TO BE USED FOR SINGLE-FAMILY HOUSEHOLD LIVING; SIZE AND LOCATION AS PER APPLICATION/PLANCity of Philadelphia · 2024
FOR LEVEL II INTERIOR ALTERATIONS WITH A CHANGE IN USE WITHOUT A CHANGE IN OCCUPANCY CLASSIFICATION TO GROUP M RETAIL SALES OF CONSUMER GOODS (SALE OF VINTAGE MERCHANDISE) WITH ACCESSORY COFFEE SHOP. EXISTING BUILDING IS NOT SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK. **SEPARATE PERMIT REQUIRED IN ACCORDANCE WITH SECTION A-301.1 OF THE PHILADELPHIA ADMINISTRATIVE CODE FOR FIT-OUT AND PARTIAL CHANGE OF OCCUPANCY AT ADJOINING 749 S 4TH ST TO CREATE NON-SEPARATED GROUP M SALE OF VINTAGE MERCHANDISE.*City of Philadelphia · 2024
FOR INSTALLATION OF MECHANICAL APPLIANCES AS PER PLANS.City of Philadelphia · 2023
FOR THE ERECTION OF AN ADDITION ON AN EXISTING NON-COMBUSTIBLE STRUCTURE TO INCLUDE METAL-FRAMED CONSTRUCTION, FOUNDATION INSTALLATION, AND RATED EXTERIOR FENESTRATIONS. (IEBC 2018, ADDITIONAL ENERGY EFFICIENCY PACKAGE: REDUCED INTERIOR LIGHTING POWER) **SEPARATE PERMITS TO BE REQUIRED FOR ELECTRICAL, MECHANICAL, AND PLUMBING INSTALLATIONS.**AMENDED AS OF 11/2/2022 TO APPOINT TREVOR HENRY AS THE NEW DPRC-SI.** AMENDED AS OF 3/9/2023 AS PER PLANS**City of Philadelphia · 2021
FOR THE LOT ADJUSTMENT TO CREATE FOUR LOTS (PARCELS "A", "B", "C" AND "D" ON THE PLAN) FROM TWO EXISTING LOT 2212-32 ALTER ST. AND 2234 ALTER ST SIZE AND LOCATION AS SHOWN ON THE PLAN.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you OCTO STUDIO, INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to OCTO STUDIO, INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2020
INSTALLATION OF 1 STORY PREFABRICATED/MODULAR TYPE STEEL BUILDING AS PER MANUFACTURERS PLANS AND SPECIFICATIONS, ASSOCIATED SITE/CIVIL WORK ADJACENT GREEN SPACE AND LOT, CONSTRUCTION OF NEW FOUNDATION SYSTEM AND FLOOR SLAB , NEW BOILER SYSTEM AND HEATED SLAB, NON LOAD BEARING INTERIOR PARTITIONS AND FINISHES FOR ARTIST STUDIO /OFFICE SPACE. ADD'L PERMITS REQUIRED: ELECTRICAL, PLUMBINGCity of Philadelphia · 2011
Permitted projects on public record. Addresses are omitted for privacy.