What the public permit record shows, not self-reported reviews.
Is NORTHSTAR ELECTRICAL SVCS INC a real contractor?
NORTHSTAR ELECTRICAL SVCS INC appears in public building-permit records with 20 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is NORTHSTAR ELECTRICAL SVCS INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to NORTHSTAR ELECTRICAL SVCS INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is NORTHSTAR ELECTRICAL SVCS INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. NORTHSTAR ELECTRICAL SVCS INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is NORTHSTAR ELECTRICAL SVCS INC's work?
The most recent permit on record for NORTHSTAR ELECTRICAL SVCS INC is dated 2025-05-30, with 20 permits on file in total.
Install (5) Electrical Vehicle Chargers in parking lot as shown in plans and as per 2017 NEC.City of Philadelphia · 2025
Installation of new distribution and electrical equipment, including outlets, lamps, and switches.City of Philadelphia · 2024
Electrical Permit for combo CP-2024-004028City of Philadelphia · 2024
CHANGE MAIN CIRCUIT BREAKER PANEL INTO JUNCTION BOX AND RELOCATE NEW MAIN CIRCUIT BREAKER A FEW FEET AWAY FROM THE JUNCTION BOX ACCORDING TO THE 2017 NEC.City of Philadelphia · 2024
-remove the existing 25kva transformer and 10kva transformer as well as all associated wiring
-supply & install 100amp fusible 2phase disconnect switch
-supply and install 50kva Scott-T transformer to convert 2phase to 3phase. This will provide up to 100amps of 3phase power at 240volt.
-supply and install 100amp 18-circuit 3phase electrical panel . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.City of Philadelphia · 2024
**ALL WORK TO BE DONE VIA FISHING OF EXISTING WALLS - NO NEW WALLS TO BE BUILT/OPENED**
12-GFI receptacles
8-convenience receptacles
1-smoke detector
5-single pole dimmers
2-3way dimmers
16-light fixtures
1-ceiling fan
As per 2017 necCity of Philadelphia · 2023
**Please note there is no associated building permit** - we will be fishing wires, no walls are being opened.
13-install receptacle
1-relocate receptacle
12-surface mount fixtures
17-recessed fixtures
1-under counter lighting
18-switches
6-appliances
1-3pole 60amp breaker for new subpanel location
As per 2017 nec
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you NORTHSTAR ELECTRICAL SVCS INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to NORTHSTAR ELECTRICAL SVCS INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2022
INSTALL TRACK LIGHTS, RECESSED LIGHTS & DIMMER SWITCHES. INSTALL A 120V FREEZER RECEPTACLE.
ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2022
**Please note there is no associated building permit**
Install the following surface-mounted fixtures via surface-mounted conduit - no walls will be opened.
(Mechanic Area)
1-new exterior wall light
2-new exterior spotlight
2-new surface mounted switches for exterior spotlights
(Cleaning Area)
10-new exterior spotlights
(Dollar Thrifty area)
6-new emergency light fixtures (surface mounted)
4-new outdoor emergency lights
As per 2017 NECCity of Philadelphia · 2022
Electric permit in combo with Building permit RP-2022-004250.
Demo existing lighting & electric
Installation of (29) lights, (23) receptacles, (2) undercabinet lighting sections, and (2) exhaust fans (ventilation by others)
relocation of (4) receptacles
safe off subpanel in closet and refeed with new circuits pulled from main panel in basement.
Replace existing knob, tube wiring, and install needed AFCI breakers.
As per 2014 necCity of Philadelphia · 2022
INSTALL A 400 AMP SERVICE AND DUCT BANK, (4) GANG METER MODULE, INSTALL (1) 200 AMP PANEL & FEEDER FOR THE HOUSE PANEL, INSTALL (1) 200 AMP PANEL & FEEDER TO THE FUTURE TENANT KIDS STORE. ALL WORK COMPLETED AS PER THE 2017 NEC.City of Philadelphia · 2021
installation of (27) new light fixtures and (6) dimming switches;
replacement of (12) existing light fixtures (all drywall already in place - all wiring to be fished through existing cavities) as per 2017 necCity of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.