What the public permit record shows, not self-reported reviews.
Is NORMAN COOPER a real contractor?
NORMAN COOPER appears in public building-permit records with 12 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is NORMAN COOPER's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to NORMAN COOPER by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is NORMAN COOPER licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. NORMAN COOPER has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is NORMAN COOPER's work?
The most recent permit on record for NORMAN COOPER is dated 2026-02-23, with 12 permits on file in total.
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2026
FOR LEVEL III ALTERATION WITH COMPLETE CHANGE OF OCCUPANCY CLASSIFICATION TO CREATE THREE DWELLING UNITS WITHIN THE EXISTING STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. SEPARATE PERMITS REQUIRED FOR MEP AND FP WORK.
AMENDMENT#1 TO CHANGE 1ST FLOOR LAYOUT.City of Philadelphia · 2025
MAKE SAFE PERMIT- For the Sistering of (5) Roof Rafters (like in kiind), replacement of roof Sheeting 4 ft. W. x 8 ft L. with 3/4 cdx plywood (like in kind) , install roof membrane over the repaired area and replace missing brick at top of South Wall as per Engineer’s report to resolve case #CF-2023-016776 . Abutting sidewalk must be closed with fencing a minimum of 6’ in height. Separate Streets Department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case #CF-2023-016776 .City of Philadelphia · 2023
FOR CHANGE OF OCCUPANCY AT SECOND FLOOR TO EXPAND EDUCATIONAL (DAYCARE) AND LEVEL III ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. BUILDING TO BE SPRINKLERED PER NFPA 13 THROUGHOUT. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.City of Philadelphia · 2021
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. *ROOFTOP UNITS PERMITTED IF INCLUDED IN BUILDING PLANS*
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you NORMAN COOPER?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2020
EZ PERMIT STANDARDS ALTERATIONS - FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; INCLUDING UNDERPINNING, EXCAVATION, AND REMOVAL OF FOUNDATION SLAB. NO WORK MAY BE PEFORMED IN THE BASEMENT OR CELLAR. REPLACE 3 ENTRY DOORS & 2 WINDOWS WITH NO CHANGE IN SIZE OR LOCATION, SISTER 2 1ST FLOOR JOISTS, LAMINATE FLOORING IN BEDROOM, RE-COAT (SILVER COAT) ROOF REPLACE SHINGLE ON REAR PORCH ROOF. *CONTRACTOR HAS NO EMPLOYEES PER NOTARIZED LETTER*City of Philadelphia · 2019
FABRICATE AN OUTSIDE DECK ACCORDINMG TO THE PLANS.City of Philadelphia · 2018
LEVEL II ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO EXPAND AN EXISTING FIRST FLOOR DAYCARE INTO THE BASEMENT AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED.
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2018
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- (2) HEATER AND AC UNITS. FOR THE INSTALLATION IF NEW DUCTWORK, REGISTERS/GRILLES/DIFFUSERS, AND WARM-AIR APPLIANCES AS PER ATTACHED STANDARDS. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.City of Philadelphia · 2018
MAKE SAFE PERMIT- FOR REPLACEMENT OF 2 FLOOR JOIST WITH LIKE IN KIND IN EXITING POCKETS AND PATCH ROOF TO RESOLVE CASE 632801. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6' IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE 632801.CALL AND PERFORM AN INSPECTION WITH THE INSPECTOR PRIOR TO THE START OF WORK.City of Philadelphia · 2018
INTERIOR ALTERATIONS TO EXISTING THREE STORY ATTACHED STRUCTURE TO CREATE TWO DWELLING UNITS PER SUBMITTED PLANS.City of Philadelphia · 2018
CHANGE USE FROM A SINGLE FAMILY DWELLING TO A DUPLEXCity of Philadelphia · 2018
Permitted projects on public record. Addresses are omitted for privacy.