What the public permit record shows, not self-reported reviews.
Is My philly contractor a real contractor?
My philly contractor appears in public building-permit records with 13 permits filed through 2023 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is My philly contractor's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to My philly contractor by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is My philly contractor licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. My philly contractor has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is My philly contractor's work?
The most recent permit on record for My philly contractor is dated 2023-08-11, with 13 permits on file in total.
FOR THE ERECTION OF A SEMI-DETACHED, THREE-STORY STRUCTURE OF TYPE VB CONSTRUCTION WITH FRONT PORCH AND A BASEMENT CRAWLSPACE AS PER PLANS. FOR THREE DWELLING UNITS WITH LAYOUT AS SHOWN.
AMENDMENT (4/11/2024) FOR CHANGES TO EXTERIOR FACADE AS PER REVISED PLANS.
AMENDMENT (7/10/2024) TO REMOVE THE COMMON METER ROOM AS PER PLANS.
AMENDMENT (10/31/2025) TO UPADATE HEIGHT OF CRAWLSPACE AND LOCATION OF CRAWLSPACE ACCESS PANELCity of Philadelphia · 2023
EZ PERMIT STADARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT).City of Philadelphia · 2023
FOR CHANGE OF OCCUPANCY, ERECTION OF ADDITION, AND LEVEL III ALTERATIONS TO INCLUDE UNDERPINNING, NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R MINIMUM. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IBC*City of Philadelphia · 2022
FOR THE ERECTION OF AN ADDITION, CHANGE OF OCCUPANCY, LEVEL III ALTERATIONS TO INCLUDE UNDERPINNING, NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R MINIMUM. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IBC*
AMENDMENT 11/9/2023 TO CHANGE EXTERIOR WALL ASSEMBLY.City of Philadelphia · 2022
FOR THE ERECTION OF AN ATTACHED, THREE-STORY STRUCTURE OF TYPE VB CONSTRUCTION WITH A CELLAR AS PER PLANS. FOR THREE (3) DWELLING UNITS WITH LAYOUT AS SHOWN.
AMENDMENT (2/28/2023) TO RAISE THE BASEMENT SLAB AND THE ENTIRE STRUCTURE AS PER REVISED PLANS.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you My philly contractor?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to My philly contractor's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2022
FOR THE ERECTION OF AN ATTACHED THREE STORY STRUCTURE FOR USE AS A SINGLE FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
**A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 7.5 FEET (1/4TH OF HEIGHT OF BUILDING) OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2022
NEW CONSTRUCTION OF A THREE (3) STORY BUILDING. FOR USE AS A THREE (3) FAMILY DWELLING AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. WORK TO INCLUDE UNDERPINNING TO BE MONITORED AT ALL TIMES BY A PA LICENSED PE. *2018 IBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
AMENDMENT: Underpinning no longer required as per uploaded letter. REMOVED UNDERPINNING FROM SPECIAL INSPECTIONS.
AMENDMENT: To add Construction Type under occupancy.City of Philadelphia · 2022
FOR LEVEL III INTERIOR ALTERATIONS TO AN EXISTING TWO (2) STORY ATTACHED MASONRY STRUCTURE WITH LIGHT-WOOD-FRAMED REAR AND 3RD STORY ADDITION ABOVE OF TYPE VB CONSTRUCTION. FOR USE AS A FOUR (4) FAMILY DWELLING (GROUP R-2 USE & OCCUPANCY CLASSIFICATION). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES REQUIRED AT ALL TIMES. **INCLUDES UNDERPINNING**City of Philadelphia · 2022
FOR 3RD STORY AND REAR 3-STORY ADDITION AND LEVEL III ALTERATION TO THE EXISTING ATTACHED STRUCTURE TO CREATE A THREE (3) DWELLING UNITS BUILDING. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.City of Philadelphia · 2022
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES
For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2022
NON STRUCTURAL RENOVATIONS.City of Philadelphia · 2021
(1) ADDITION TO EXISTING 2.5-STORY, SINGLE-FAMILY HOME. EXPANSION OF EXISTING THIRD FLOOR, AND EXTENSION OF EXISTING SECOND FLOOR OVER EXISTING REAR ONE-STORY PORTION OF HOUSE. NEW TERRACE AT THIRD FLOOR GRADE, ACCESSIBLE FROM THIRD FLOOR, WITH SPIRAL STAIRS LEADING TO NEW ROOF DECK (NO ACCESS STRUCTURE). DECK SET BACK 5'+ FROM PROPERTY LINE. EXISTING THIRD FLOOR GABLE ROOF REPLACED WITH NEW SLANTED METAL ROOFING AS SHOWN.
(2) RENOVATIONS THROUGHOUT: INTERIOR DEMO OF PARTITIONS, CABINETRY, AND CHIMNEY. NEW FINISHES THROUGHOUT. NEW LAYOUT AT EACH FLOOR AND BASEMENT. NEW MASTER BED AND BATH CREATED AS PART OF THIRD FLOOR ADDITION.
(3) STRUCTURAL WORK AS SHOWN IN STRUCTURAL PLAN. NEW CMU FOUNDATION WALL AT REAR OF HOUSE FOR NEW ADDITION.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.