What the public permit record shows, not self-reported reviews.
Is MURAT ASLANSAN a real contractor?
MURAT ASLANSAN appears in public building-permit records with 62 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MURAT ASLANSAN's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MURAT ASLANSAN by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MURAT ASLANSAN licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MURAT ASLANSAN has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MURAT ASLANSAN's work?
The most recent permit on record for MURAT ASLANSAN is dated 2026-05-01, with 62 permits on file in total.
NEW CONSTRUCTION OF A FOUR (4) STORY BUILDING WITH CELLAR, COMMON ROOF DECK, PILOT HOUSES AND GREEN ROOF FOR USE AS A SHELL COMMERCIAL SPACE (USE REGISTRATION & FIT-OUT PERMITS REQUIRED PRIOR TO OCCUPANCY) AND TWENTY-FOUR (24) DWELLING UNITS [GREEN ROOF AND MIXED INCOME HOUSING BONUSES UTILIZED] AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. FIRE WATCH REQUIRED PER DEPARTMENT CODE BULLETIN F-2001. *2018 IBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2026
Mechanical / Fuel Gas Permit for combo CP-2025-004552City of Philadelphia · 2026
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
No exterior work permitted to the front facade as part of this permit. Mechanical Equipment in rear should be minimally visible from the public right-of-way(As per PHC conditions).
Install HVAC split system throughout home, ductwork, and 15 diffusersCity of Philadelphia · 2026
FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF A ROOF DECK AND DECK ABOVE AND AT THE REAR. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
For interior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only.City of Philadelphia · 2025
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MURAT ASLANSAN?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR LEVEL II INTERIOR ALTERATIONS AT THE BASEMENT AND 1ST FLOOR LEVELS WITH A PARTIAL CHANGE IN USE & OCCUPANCY CLASSIFICATION AT THE BASEMENT TO EXPAND AN EXISTING GROUP I-4 CHILD DAY CARE CENTER. EXISTING BUILDING IS FULLY SPRINKLERED PER NFPA 13. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. SEE CP-2024-003185 FOR PRIOR APPROVAL OF DAY CARE AT 1ST FLOOR.City of Philadelphia · 2025
LEVEL III ALTERATIONS TO INCLUDE ROOF DECK AND PILOT HOUSE ADDITION FOR A SHELL COMMERCIAL SPACE (FIT-OUT PERMIT REQUIRED PRIOR TO OCCUPANCY) IN THE BASEMENT THROUGH SECOND FLOORS AND TWO (2) DWELLING UNITS ABOVE AS PER APPROVED PLANS AND PHC APPROVAL. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2025
Interior renovation of existing building per plans - including new kitchen and bathrooms. Existing habitable space in the basement with existing 7ft ceilings. NO UNDERPINNING OR EXCAVATIONS (I.E. DIGGING IN BASEMENT). IS PERMITTED ON THIS PERMIT.**AMENDED 9/2/25- removal of fireplace and relocation of stairs per plans. no other changes approved on this amendment. **City of Philadelphia · 2025
FOR THE ERECTION OF A TWO-STORY ADDITION WITH ROOF DECK ACCESSED BY A ROOF ACCESS STRUCTURE ABOVE EXISTING REAR TWO-STORY PORTION, A THIRD FLOOR ADDITION WITH DECK, AND COURTYARD WITH A CHANGE OF OCCUPANCY TO CREATE A TWO-FAMILY DWELLING (GROUP R-3) WITHIN AN EXISTING STRUCTURE AS PER APPROVED PLANS. HEIGHT NTE 38 FT. EXISTING BUILDING TO BE SPRINKLERED. *2018 IEBC REVIEW*
*SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*
**UNDERPINNING IS NOT PART OF THIS PERMIT**City of Philadelphia · 2025
Remove existing fence and construct 6' brick wall inside yard in its place. details per planCity of Philadelphia · 2024
MAKE SAFE PERMIT TO RESOLVE CASE #CF-2024-077989 TO REPAIR BULGED FRONT WALL AND SIDE WALL WITH LOOSE AND MISSING BRICKS AS PER ENGINEER’S REPORT AND APPROVED ENGINEER PLANS. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6’ IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #CF-2024-077989.City of Philadelphia · 2024
MAKE SAFE PERMIT TO RESOLVE CASE #CF-2024-011524 TO REPAIR FRACTURED BULGED SIDE EXTERIOR WALL- BY DEMOLITION OF 11 FT. HIGH CMU WALL AND REMOVING WOOD WALL TRELLIS AND REPLACING WITH 6 FT. HIGH CMU WALL AS PER ENGINEER’S REPORT AND APPROVED ENGINEER PLANS. “IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION.” A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #CF-2024-011524.City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.