What the public permit record shows, not self-reported reviews.
Is MUHARREM ATALAN a real contractor?
MUHARREM ATALAN appears in public building-permit records with 7 permits filed through 2022 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MUHARREM ATALAN's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MUHARREM ATALAN by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MUHARREM ATALAN licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MUHARREM ATALAN has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MUHARREM ATALAN's work?
The most recent permit on record for MUHARREM ATALAN is dated 2022-08-11, with 7 permits on file in total.
FOR UNDERPINNING AND FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND AN ACCESSORY ROOF DECK ACCESSED BY TWO (2) ROOF DECK ACCESS STRUCTURES INCLUDING A SIX (6) FT HIGH FENCE FACING ON SIGEL STREET. FOR A TWO-FAMILY HOUSEHOLD LIVING. AS PER PLANS.************ SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, MECH. OR ELECTRICAL WORK.*********************************
AMENDMENT: To remove Underpinning from special inspections and for the modification of the elevation of the house to propose 4 feet foundation walls to ground.City of Philadelphia · 2022
FOR UNDERPINNING AND FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND TWO ROOF DECKS ACCESSED BY ROOF DECK ACCESS STRUCTURES. FOR A TWO-FAMILY HOUSEHOLD LIVING. AS PER PLANS.
AMENDMENT: TO REMOVE UNDERPINNING, CHANGE ELEVATION AND STRUCTURAL FOUNDATION AS PER APPROVED PLANS.City of Philadelphia · 2022
ERECTION OF A NEW THREE (3) STORY BUILDING, WITH BASEMENT, A ROOF DECK AND A ROOF ACCESS STRUCTURE. FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING AS PER PLANS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
3/10/2022 AMENDMENT: AMEND ORIGINAL PERMIT WITH NEW SPECIAL INSPECTION AGENCYCity of Philadelphia · 2020
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER WORK. UNDERPINNING IS PART OF THIS PERMIT WITH CONTINUANCE INSPECTIONS.. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IRC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2020
PROPOSING UNDERPINNING; ** AMEND TO UPDATE SPECIAL INSPECTION AGENCY (SIA) INFORMATION **
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MUHARREM ATALAN?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2020
FOR THE ERECTION OF A THRID FLOOR REAR ADDITION WITH A ROOF DECK, ROOF DECK ACCESS STRUCTURE AND A FACADE ADDITION (BAY PROJECTIONS) TO AN EXISTING THREE (3) STORY STRUCTURE AS PER APPROVED PLAN AND ENGINEER REPORT
AMENDMENT APPROVED AS OF 5/20/2024: AMEND THE ORIGINAL PERMIT FOR THE SIZE OF STAIR AND MODIFICATION OF INTERIOR / EXTERIOR WALL. FOR THE REMOVAL OF PROPOSED UNDERPINNING.City of Philadelphia · 2019
FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE. FOR USE AS SINGLE FAMILY DWELLING. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPP. WORK. ** AMEND TO UPDATE SPECIAL INSPECTION AGENCY (SIA) INFORMATION **City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.