What the public permit record shows, not self-reported reviews.
Is MECO DEMOLITION INC a real contractor?
MECO DEMOLITION INC appears in public building-permit records with 32 permits filed through 2024 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MECO DEMOLITION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MECO DEMOLITION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MECO DEMOLITION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MECO DEMOLITION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MECO DEMOLITION INC's work?
The most recent permit on record for MECO DEMOLITION INC is dated 2024-01-05, with 32 permits on file in total.
COMPLETE DEMOLITION OF EXISTING BUILDING BY HAND AND MECHANICAL EQUIPMENT AS PER PLANS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. FULL SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. BACKFILL MUST TAKE PLACE WITHIN 30 DAYS OF DEMOLITION COMPLETION.City of Philadelphia · 2024
FOR THE COMPLETE DEMOLITION OF A ONE 1-STORY EXISTING STRUCTURE USING MECHANICAL DEVICES AS PER APPROVED PLANS. ALL PERMITTED DEMOLITION ACTIVITY IS TO BE DONE IN ACCORDANCE WITH THE SITE SAFETY DEMOLITION PLAN AND SUCH PLAN IS TO BE MAINTAINED ON SITE AT ALL TIMES. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO THE START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL IS REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.City of Philadelphia · 2022
FOR THE COMPLETE DEMOLITION OF ONE EXISTING DETACHED SINGLE-STORY, VACANT COMMERICAL STRUCTURE BY MECHANICAL DEMOLITION, ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE.ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN SIX (6) FEET OF BUILDING FACADES IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2021
FOR THE COMPLETE DEMOLITION OF ONE EXISTING DETACHED SINGLE-STORY, VACANT COMMERICAL STRUCTURE BY MECHANICAL DEMOLITION, ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE.ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN SIX (6) FEET OF BUILDING FACADES IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MECO DEMOLITION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MECO DEMOLITION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2021
FOR THE PROPOSED DEMOLITION OF MULTIPLE ONE STORY DETACHED STRUCTURES TO BE COMPLETED BY MECHANICAL MEANS. PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 9 FEET OF BUILDING FACADES IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.*
IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2021
FOR THE COMPLETE DEMOLITION OF AN EXISTING THREE (3) STORY ATTACHED STRUCTURE USING HAND HELD DEVICES AND MECHANICAL METHOD. STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE PRIOR TO THE START OF WORK.City of Philadelphia · 2020
FOR THE COMPLETE DEMOLITION OF ONE EXISTING DETACHED TWO-STORY, MASONRY VACANT STORAGE STRUCTURE BY MECHANICAL MEANS . ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE.ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF BUILDING FACADES IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF EXISTING DETACHED STRUCTURE AS SHOWN PER APPROVED PLANS. FOR USE AS ACity of Philadelphia · 2019
DEMO OF ENTIRE STRUCTURECity of Philadelphia · 2013
COMPLETE DEMOLITION OF A 33'L X 25'W TWO STORY STAND ALONE STRUCTURE, THAT WAS USED TO HOUSE ELEVATOR FOR CRUISE SHIP, ELEVATOR HAS BEEN REMOVED AND ELECTRICAL WAS TERMINATED, DEMOLITION TO START ON OR AFTER 5/13/2013City of Philadelphia · 2013
COMPLETE DEMOLITION OF 1 STORY BUILDING AS PER ATTACHED SITE PLAN.City of Philadelphia · 2012
FOR THE DEMOLITION OF ONE (1) STRUCTURE (BUILDING #574) AND FENCES ON THE SAME LOT WITH OTHER STRUCTURES WITH USES AS PREVIOUSLY APPROVED. SIZE AND LOCATION AS SHOWN IN THE APPLICATION.City of Philadelphia · 2012
Permitted projects on public record. Addresses are omitted for privacy.