What the public permit record shows, not self-reported reviews.
Is MATRIX NORTH AMERICAN CONSTRUC a real contractor?
MATRIX NORTH AMERICAN CONSTRUC appears in public building-permit records with 15 permits filed through 2016 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MATRIX NORTH AMERICAN CONSTRUC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MATRIX NORTH AMERICAN CONSTRUC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MATRIX NORTH AMERICAN CONSTRUC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MATRIX NORTH AMERICAN CONSTRUC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MATRIX NORTH AMERICAN CONSTRUC's work?
The most recent permit on record for MATRIX NORTH AMERICAN CONSTRUC is dated 2016-11-23, with 15 permits on file in total.
FOR THE AMENDEMENT OF PREVIOUSLY APPROVED PERMIT #663381 FOR THE REMOVAL OF THE GEODESIC DOME COVER ON TOP OF EXISTING TANK #841. ORIGINAL PERMIT APPROVED FOR THE INSTALLATION OF GEODESIC DOMES ON TWO EXISTING TANKS (NO. 841 AND NO. 847) ACCESSORY TO EXISTING INTENSIVE INDUSTRIAL USE ON THE LOT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITION VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2016
FOR THE INSTALLATION OF GEODESIC DOMES ON TWO EXISTING TANKS (NO. 841 AND NO. 847) ACCESSORY TO EXISTING INTENSIVE INDUSTRIAL USE ON THE LOT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITION VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2016
INSTALL DATA VOICE AV WIRING CAT 6 (LONGEST RUN 500 FT)FOR 11TH FLOOR RENOVATION OF PES PER 2008 NEC (OFFICE SPACE)CC DISTRICTCity of Philadelphia · 2016
FOR THE INSTALLATION OF GEODESIC DOMES ON TWO EXISTING TANKS (NO. 885 AND NO. 886) ACCESSORY TO EXISTING INTENSIVE INDUSTRIAL USE ON THE LOT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITION VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2015
REMOVAL OF ONE (1) ABOVE GROUND STORAGE TANK SERVING ELECTRIAL EQUIPMENT. ALL WORK COMPLETED IN ACCORDANCE WITH PA-DEP UST REMOVAL GUIDELINES. ABATEMENT/ TRANSPORTATION TO BE PROVIDED BY PSC INDUSTRIAL OUTSOURCING LP.
A CERTIFICATION TO BE SUBMITTED TO INSPECTOR. REMOVE 1-ABOVE GROUND STORAGE TANK AND ASSOCIATED ENCLOSURE **POST THIS PERMIT** **POST THE PROJECT INFORMATION SIGN**City of Philadelphia · 2015
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MATRIX NORTH AMERICAN CONSTRUC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MATRIX NORTH AMERICAN CONSTRUC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
PROVIDE POWER TO 4-NEW CEMS ANALYZER SHELTERS FOR THE REFINERY FLARES, PROVIDE/INSTALL GROUNDING SYSTEM AT EACH SHELTER INSTALL AERIAL/CONDUIT POWERDIST TO EACH PER PLANS AS PER NEC 2008 OIL REFINERY SOUTH DISTRICTCity of Philadelphia · 2015
FOR THE ERECTION OF A ONE STORY BUILDING FOR AMBIENT AIR MONITORING PURPOSES ACCESSORY TO INTENSIVE INDUSTIAL USE ON THE LOT. WORK TO INCLUDE THE CONSTRUCTION OF A CONCRETE PAD, AND BOLLARDS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2015
FOR THE ERECTION OF A ONE STORY BUILDING FOR AMBIENT AIR MONITORING PURPOSES ACCESSORY TO INTENSIVE INDUSTIAL USE ON THE LOT. WORK TO INCLUDE THE CONSTRUCTION OF A HIGH STEEL FRAME METEORLOFICAL TOWER (WEATHER STATION), CONCRETE PAD, AND BOLLARDS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2015
INSTALL 480V & 2.4KV AERIAL CABLE, GROUNDING FOR CONCRETE PAD & TO POLE & BLDG, INSTALL XFMR & NEW CONDUIT ON PRIMARY & 2ND OF XFMR, TO POLE TOP & BLDG PNL & FIRE ALARM PNLS, STROBES, HORNS & PULL STATION AS PER NEC 2008 & NFPA 72(OIL REFINERY)City of Philadelphia · 2015
2-AMBIENT AIR FENCELINE MONITORING ANALYZER SHELTERS, PROVIDE 480VAC POWER VIA AERIAL DISTRIBUTION TO THE SHELTERS & INSTALL/MOUNT ANALYZER & WEATHER MONITORING EQUIPMENT AS PER NEC 2008 COMMCity of Philadelphia · 2015
PERMIT LIMITED TO LIGHTING AND LOW VOLTAGE FIXTURE IN CONJUNCTION WITH THE MASTER SUBSTATION SWITCHGEAR ENCLOSURE - PERMIT NOT ASSOCIATED WITH THE FUNCTIONAL PERFORMANCE OF THE SUBSTATION - WORK WILL COMPLY WITH THE APPROVED PLANS AND THE 2008 NECCity of Philadelphia · 2014
INSTALL NEW GROUND GRID, NEW LIGHTS, RECPTACLES, CABLE TRAY INSTRUMENTATION, 2.4KV AERIAL FEEDER, MCC, XFMR, RIE BLDG & CEMS BLDG AS PER NEC 2008 (OIL REFINERY)City of Philadelphia · 2014
Permitted projects on public record. Addresses are omitted for privacy.