What the public permit record shows, not self-reported reviews.
Is MASSIMINO BUILDING CORP a real contractor?
MASSIMINO BUILDING CORP appears in public building-permit records with 74 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MASSIMINO BUILDING CORP's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MASSIMINO BUILDING CORP by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MASSIMINO BUILDING CORP licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MASSIMINO BUILDING CORP has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MASSIMINO BUILDING CORP's work?
The most recent permit on record for MASSIMINO BUILDING CORP is dated 2026-04-13, with 74 permits on file in total.
FOR EXTERIOR REPAIRS TO INCLUDE MASONRY REPAIR AND WINDOW REPLACEMENTS AS PER APPROVED PLANS.City of Philadelphia · 2026
FOR GENERAL EARTH DISTURBANCE IN ASSOCIATION WITH REPLACEMENT OF WATERPROOFING, CONCRETE EXPANSION JOINT(S), PAVERS, CONCRETE TOPPING SLAB, AND EARTH/GRAVEL INFILL AT AN EXISTING PLAZA. **2018 IBC REVIEW**City of Philadelphia · 2026
FOR LEVEL II ALTERATIONS TO EXISTING LAB 235 IN AN EXISTING STRUCTURE. NO CHANGE IN USE OF STRUCTURE. BUILDING IS FULLY SPRINKLED
AS PER NFPA 13. TO INCLUDE PARTIAL DEMO AND INSTALLATION OF FIRE BARRIER AND CAULK, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS.
***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************City of Philadelphia · 2025
FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF THE FOURTH FLOOR LEVEL OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**ASBESTOS REMEDIATION REQUIRED PRIOR TO TART OF WORK**City of Philadelphia · 2025
FOR A ROOF REPAIR.** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS,
PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION.
***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MASSIMINO BUILDING CORP?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MASSIMINO BUILDING CORP's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO GROUND FLOOR TOILET ROOMS IN AN EXISTING HIGHER EDUCATIONAL FACILITY (WILLIAMS HALL - C-29) AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**City of Philadelphia · 2025
FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 2ND FLOOR LEVEL OF AN EISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**City of Philadelphia · 2024
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO AN EXISTING HIGHER EDUCATIONAL FACILITY (LAB # 104).
AS PER APPROVED PLANS. BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW.
************SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK*******************City of Philadelphia · 2024
Exterior alteration for roof top fall protection as per approved plans.City of Philadelphia · 2024
FOR A ROOF DECK REPAIR TO AN EXISTING STRUCTURE. ** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018** EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK** EXTERIOR WORK ONLY**City of Philadelphia · 2023
FOR LEVEL II ALTERATIONS TO INCLUDE ROOF REPAIR, NEW PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK.City of Philadelphia · 2023
Permitted projects on public record. Addresses are omitted for privacy.