What the public permit record shows, not self-reported reviews.
Is MARQUIS CONSTRUCTION SERVICES INC a real contractor?
MARQUIS CONSTRUCTION SERVICES INC appears in public building-permit records with 6 permits filed through 2023 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MARQUIS CONSTRUCTION SERVICES INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MARQUIS CONSTRUCTION SERVICES INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MARQUIS CONSTRUCTION SERVICES INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MARQUIS CONSTRUCTION SERVICES INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MARQUIS CONSTRUCTION SERVICES INC's work?
The most recent permit on record for MARQUIS CONSTRUCTION SERVICES INC is dated 2023-01-16, with 6 permits on file in total.
FOR LEVEL II ALTERATION TO INCLUDE NEW MEZZANINE, NEW DOORS, PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
AMENDMENT 4/27/23 TO REMOVE MEZZANINE, RELOCATE/REMOVE DOORS, MODIFY PARTITIONS, STAIR MODIFICATIONS, STRUCTURAL CHANGES AS PER PLANS.City of Philadelphia · 2023
For Level II Alterations with without a change of occupancy classification to an existing Group S-1 occupancy (warehouse w/accessory offices and fabrication shop) in an existing single-story detached structure, as per plans; separate permits required for all MEP/FSP work; structural work on this permit to include the erection of a crane-rail on the interior of the building; building is currently sprinklered throughout in accordance with NFPA 13; if field conditions vary contact design engineer prior to the start of any work; compliance with Philadelphia Fire and Property Maintenance Codes required prior to occupancy; see ZP-2021-000793 for zoning/use approval.City of Philadelphia · 2022
FOR SITE WORK ONLY FOR EXISTING TRUCKING TERMINAL AND EQUIPMENT STORAGE YARD, WORK TO ONLY INCLUDE SITE WORK AS SHOWN PER APPROVED WORK. SEPARATE PERMITS TO BE OBTAINED FOR ABOVE GROUND CONSTRUCTION WORK. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2021
FOR A LEVEL II INTERIOR ALTERATION TO AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF NEW WALL PARTITIONS AND TO PROVIDE FINISHES AND FURNISHINGS THROUGHOUT . MINOR STRUCTURAL WORK TO BE INCLUDED FOR THE ERECTION OF A STRUCTURAL PLATFORM. ALL WORK TO BE DONE PER APPROVED PLANS.**BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 **IEBC 2018** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**ANY DEVIATION TO THE APPROVED SCOPE OF WORK WILL REQUIRED AN AMENDED PERMIT**City of Philadelphia · 2021
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MARQUIS CONSTRUCTION SERVICES INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MARQUIS CONSTRUCTION SERVICES INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR THE ERECTION OF AN ADDITION TO AN EXISTING DETACHED BUILDING. FOR USE AS A TRUCKING AND TRANSPOTATION TERMINALS AND MAINTENNANCE OF COMMERCIAL VEHICLES. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR M.E.P.S WORK.City of Philadelphia · 2021
FOR INTERIOR ALTERATIONS AND THE ERECTION OF AN EXTERIOR RAMP AS PER APPROVED PLANS. FOR ISSUANCE OF CERTIFICATE OF OCCUPANCY AT COMPLETION OF WORK. ASBESTOS REMOVAL REQUIRED PRIOR TO COMMENCING WORK.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.